016-0171-655 Rev. E
27
NOZZLE CONTROL VALVE INSTALLATION
PRIMARY BOOM CABLE ROUTING AND CONNECTIONS
NOTE:
Best Practices and Recommendations
section on page 25 before routing or securing the
boom cables on the implement. Do not connect or secure the cable until instructed to do so in the
procedure.
1. Locate the large, round connectors on the primary boom cables (refer to the
Route the primary cables so the connector with female pins is located at the mid-boom fold point of the left or
right boom and will connect to the secondary boom cable.
FIGURE 15. Primary Cable Ends
2. Starting at the center of the implement, feed the female receptacle end of the primary boom cable through the
boom framework along existing cable or plumbing runs and through any existing cable retention devices.
3. Connect the large, round connectors on the primary and secondary boom cables to each other.
4. Adjust the primary and secondary boom cables to ensure sufficient slack around the mid-boom fold point and
allow each cable to reach nozzle control valves near the folding point.
5. Secure the primary and secondary connection using the supplied zip ties as necessary to protect the connector
from damage during folding and unfolding operations.
6. Starting at the valve on the primary boom segment furthest from the center of the implement, connect the
valve tee branches to the nozzle control valves.
7. At each valve branch, adjust the cable as necessary to provide slack between nozzle control valve connections
and use the supplied zip ties to secure the cable at each valve branch. Refer to Figure 13 on page 26. The large,
round connector with male pins on the primary boom cable should reach to the center of the implement after
all nozzle control valves are connected.
8. Repeat this procedure to route the primary boom cable on the opposite boom.
Female Receptacle
To Secondary Boom Cable/Mid-Boom
Fold Point
Male Connector
To Center Rack/Chassis Connector
Summary of Contents for RG1300
Page 8: ...CHAPTER 1 4 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 20: ...CHAPTER 2 16 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 22: ...CHAPTER 3 18 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 32: ...CHAPTER 4 28 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 38: ...CHAPTER 5 34 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 43: ...016 0171 655 Rev E 39 CHASSIS CABLE INSTALLATION SYSTEM DIAGRAMS...
Page 50: ...APPENDIX A 46 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 54: ...APPENDIX B 50 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Page 58: ...Index 54 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...