Hawker Lifetech Instructions Download Page 3

Phase 3 bay cabinet (2-3kW)  & three phase

 MEcHaNIcaL INStaLLatIoN

The charger can be wall or floor mounted. If wall mounted  

make sure that the surface is free of vibrations and the char-

ger is mounted in a vertical position; if floor mounted make 

sure that the  surfaces are free of vibration, water, humidity.

You must avoid areas where the chargers may be splashed 

with water.

The charger must be held by 2 or 4 fixings suitable for the type 

of support. The drilling pattern varies according to the model 

of charger (please refer to the technical data sheet).

 ELEctrIcaL coNNEctIoN

To the mains supply

You  may  only  connect  to  the  1-phase  230Vac  or  3-phase 

400Vac mains supply (depending on the type of the charger) 

by means of a standard socket and an appropriate circuit  

breaker (not supplied). The current consumption is shown on 

the charger’s information plate.

To the battery

Polarity must be observed. Any reversal of polarity will blow 

the output fuse, prevent charging and cause DF2 fault code to 

be displayed. Please refer to the Fault messages codes.

Connection to battery

The charger must be connected to the battery by the cables 

supplied:

•  The RED cable: to the battery’s POSITIVE terminal.

•  The BLACK cable: to the battery’s NEGATIVE terminal.

Initiating charging

1.   Connect the battery. If Default setting (autostart ON) then 

the charge will start automatically else press the Start/

Stop button.

The display will show 3 different screens alternating

Completion of charging

1.   The LCD screen will give you the message of availability 

(

AVAIL

)

The battery is charged and ready to use.

2.  STOP the charge and disconnect the battery.

To stop the charge press the Stop/Start button.

Never disconnect the battery during charge without stopping 

the charging process.

This could lead to dangerous sparks or  to charger damage. 

3.  Completion of charging with equalization 

Manual equalization only concerns vented lead/acid batteries. 

It will be initiated manually or automatically by switch. All 

other technologies will have an automatic preset  equalization 

time.

To  force  manual  equalization  keep  pressed  the  equalization 

button (right button) and contemporary click the On/Off (only 

charging profiles for flooded). If automatic then the screen will 

also show the following message:

Ref

Function

1

AC input cable

2

DC output cable, only

3

Option port

4

Ventilation openings

5

LCD panel

6

Navigation buttons

7

Cable holder (only on single phase)

1

3

2

5

6

4

Line 1

Charge mode / charging profile /  

equal symbol (if selected) or no blocking fault 

Line 2

Charging current / total voltage / Ah+

Screen 1:

Line 1

Charge mode / charging profile /  

equal symbol (if selected) or no blocking fault

Line 2

Charging current / voltage/cell / charging time

Screen 2:

Line 1

Charge mode / charging profile /  

equal symbol (if selected) or no blocking fault 

Line 2

Charging current / % state of charge /  

estimated remaining time 

Screen 3:

•  Equalization mode auto

•   Days of the week (the symbol below indicates when the 

equailzation is programed (e.g. Saturday and Sunday)

•  During equalization

•  Line 1. mode equal

•   Current / total voltage / remaining time

1

3

2

5

6

4

7

Summary of Contents for Lifetech

Page 1: ...hat when fuses are being replaced only fuses of the specified type and of the correct are used It is strictly forbidden to use inappropriate fuses or to short circuit the fuse holders This equipment conforms to Class 1 safety standards which means that the appliance must be earthed and requires to be powered from an earthed supply Never open the equipment High voltage could be still present even t...

Page 2: ...esulphation equalizing and refreshing charges are also integrated Front Panel Ref Button LED Function Function 1 Start Stop button Start Stop charge Cancel value press during 3s select of active menu 2 Greed LED Battery available 3 Yellow LED Battery in charge 4 Red LED Fault 5 Blue LED AC supply ON light AC supply OFF AC missing 6 Arrows Navigation buttons Return to top of list press for 2 sec 7 ...

Page 3: ...ating Completion of charging 1 The LCD screen will give you the message of availability AVAIL The battery is charged and ready to use 2 STOP the charge and disconnect the battery To stop the charge press the Stop Start button Never disconnect the battery during charge without stopping the charging process This could lead to dangerous sparks or to charger damage 3 Completion of charging with equali...

Page 4: ...ective cells high tempe rature water level DF7 Pneumatic mixing air circuit fault the red light flashes Check the air circuit pump tubing TH Thermal fault resulting in interruption of charging Check that the fan s is are working correctly and or that the ambient temperature is not too high or whether there is poor natural ventilation to the charger MOD TH Alternating with charge parameters one or ...