
www.havis.com • 1-800-524-9900
1)
Tip the Docking Station to a position that is comfortable to work with.
2)
Install all cables that are necessary for computing needs.
3)
Use Zip Ties (Hardware Kit Item 1) and the Strain Relief Points on the bottom of
the Docking Station to secure cables and reduce risk of accidental disconnects.
4)
Create a service loop with cables to ensure that no tension is on the
connectors and to enable intended motion.
5)
Tie off cables onto a stationary part of the mounting system.
6
7
Installation
1)
Install the Docking Station to the Motion Device using four (4) M4 x 0.7 x 25mm
long Pan Head Screws (Hardware Kit Item 3), four (4) Split Lock Washers
(Hardware Kit Item 4), and four (4) Washers, M4 (Hardware Kit Item 5).
Torque screws to 20 in-lbs (2.3Nm) ± 10%.
NOTE:
If you are mounting the optional Front Exiting
USB Cable (Part # DS-DA-311), please refer
to page 11 before beginning Installation.
Washer, M4
Lock Washer M4 x 0.7 x 25mm Screw
Typical Motion Device Example
(not included)
Cable Management
Collect cables and secure
to the mounting system.
(Note: Mounting system not included)
This loop must be large enough
to allow full range of expected
rotation and extension without
stressing connections.