OPERATION
9
ENGLISH
Starting Operation
1. Charging the battery
The charging procedure starts as soon as the mains plug of the battery
charger is inserted into the socket supply and the charger site is slid into the
battery pack. The green light will then turn on, which means the connection to
the main supply is ok.
When charging the battery pack, the red light will be lit, the green light is off till
the battery is fully charged. Once the battery is full, the green light will turn on
again,and the red light will turn off.
When the battery pack is fully charged, please remove the battery from the
charger immediately,and then pull out the plug. It will allow you to save power,
and will maximize the life of the battery.
2. Remove the battery and pull out the plug
!
Observe the mains voltage!
The voltage of the power supply must correspond
with the data given on the nameplate of the battery charger.
!
Note:
The charging procedure is only possible when the battery temperature is
within the correct range.
State
Charging
Trouble
Fully charged
green light
red light
off
on
on
off
/
/
12V
battery pack
Cause Corrective Measure
Continuous lighting of the battery charge green light
No charging procedure possible
Battery charge red light is not lit up
Battery not (properly) inserted
Properly insert battery site into
battery pack
Battery temperature is outside of
the correct range.
Ensure that battery temperature is
between 0º - 45º (let it cool off or
warm up at room temperature before
charging)
Battery inserted
Properly insert battery site into battery
pack
Socket outlet, mains cable or
battery charger defec-tive
Check the mains voltage;have the
battery charger checked by an
authorized after-sales service agent
(please contact Customer service)
Battery defective
Replace the battery
Battery contacts contaminated
Clean the battery contacts (e.g. by
inserting and removing the battery
several times) or replace the battery
Troubleshooting