background image

Maintenance and repairs 

 

 

 

Page 14 

7

 

Maintenance and repairs 

 _____________________________________________________________________________________  

WARNING! 

High voltage! 

Danger of fatal accidents! 

Do not open unit! 

 _____________________________________________________________________________________  

 

This unit does not include any parts which can be maintained or repaired by 

the operator. HAUG only is authorized to repair or calibrate the unit. 

 

Should the unit prove defective or if a defect is suspected, switch off unit 

immediately and secure against subsequent reuse. 

 

7.1

 

Replacing fuse 

1.

 

Switch off unit. 

2.

 

Determine and remove the cause for the blown fuse. 

3.

 

Detach the fuse holder using a screwdriver and lift out. 

4.

 

Replace fuse and reattach fuse holder. 

 

Use the following fuses only: 

Unit type 

Fuse 

EN SL (MT) 100 / 115 V 

T 500 mA L 250; 5x20 mm 

EN SL (MT) 230 V 

T 250 mA L 250; 5x20 mm 

 

The unit type and the rated voltage are indicated on the nameplate. 

Only use fuses of the type indicated. 

 

7.2

 

Accessories 

Article 

Order 

number 

One Point Ionizer 

03.8510.200 

Punkt – Elektrode XP 

03.8513.200 

Punkt – Elektrode XP (Set) 

23.8513.100 

U – Elektrode 

05.8091.100 

U – Elektrode (Set) 

23.8091.100 

 

 

Summary of Contents for EN SL MT Series

Page 1: ...Power Pack EN SL Version MT Static Line Operating instructions...

Page 2: ......

Page 3: ...ption of unit 8 4 Installation 9 4 1 Important installation instructions 9 4 2 Setting up connecting 10 5 Application 11 5 1 Putting into operation 11 6 Remedy of defects 12 6 1 Troubleshooting 13 7 M...

Page 4: ...This page has been left intentionally blank...

Page 5: ...L MT is also referred to as unit 1 1 Pictorial markings used In these operating instructions NOT FOR USE by persons with pacemaker WARNING High voltage Danger of fatal accidents Do not open unit WARNI...

Page 6: ...misuse dangers may result for life and limb of the operator for the unit and other assets Also note Chapter 4 1 Important installation notes page 9 2 1 Intended use CAUTION Do not install or use the u...

Page 7: ...lectric shocks Shut down the unit immediately in case of visible damage and suspected electrical defects 2 3 Installer qualifications The unit may be installed by trained electricians only The above m...

Page 8: ...n of unit Figure 1 1 Mains switch Switch lights up green when the unit is switched on 2 Ground connection Figure 2 3 High voltage terminals 4 Check fuse for replacement refer to Chapter 7 1 page 14 5...

Page 9: ...gh voltage Danger of fatal accidents Do not open unit WARNING Only plug in unplug coaxial connector when the unit is switched off ______________________________________________________________________...

Page 10: ...e connecting always check that the unit is suitable for the local mains voltage the voltage is indicated on the name plate Incorrect mains voltage may result in damage to the unit 2 Set up unit at the...

Page 11: ...ety advice The unit is intended exclusively for the high voltage supply of HAUG ionizing units It generates an alternating high tension of approx 7 8 kV It is intended in connection with an ionizing u...

Page 12: ...e unit overheats at the ionizing unit due to short circuiting the thermal cut out will switch off the unit The power pack can only be put back into operation once the short circuit has been removed an...

Page 13: ...eck fuse for replacement refer to Chapter 7 1 page 14 Check connection Clean ionizing unit Check ionizing unit for damage If damaged immediately shut down and secure against restarting If this does no...

Page 14: ...fect is suspected switch off unit immediately and secure against subsequent reuse 7 1 Replacing fuse 1 Switch off unit 2 Determine and remove the cause for the blown fuse 3 Detach the fuse holder usin...

Page 15: ...ox 7 8 kV Short circuit current Ik 5 mA Cannot be used in pulsed mode 8 2 Supply voltage CAUTION Always connect the PE conductor green yellow conductor to the protective earth of the mains Unit type N...

Page 16: ...eme range for storage and transport 15 C to 60 C Humidity Rated application range Air pressure Rated application range 800 mbar to 1060 mbar Vibrations Extreme range for storage and transport max 1 5...

Page 17: ...tection IP 20 Protection class I Overvoltage category II Pollution severity 2 Connection to supply voltage Mains cable via socket for non heating apparatus Dimensions Height approx 170 mm Width approx...

Page 18: ...Disposal Page 18 9 Disposal Observe and maintain national and regional waste disposal regulations for the disposal of the unit...

Page 19: ......

Page 20: ...18 D 70771 Leinfelden Echterdingen Telefon 07 11 94 98 0 Telefax 07 11 94 98 298 www haug de E Mail info haug de HAUG Biel AG Postfach CH 2500 Biel Bienne 6 Johann Renfer Strasse 60 CH 2500 Biel Bien...

Reviews: