PBG
II
PACKAGED GAS BURNER
TABLE OF CONTENTS
Subject
Page
A. General
Information…………………………………………………………. 2
B. Receiving and Inspection…………………………………………………… 2
C. Capacities…………………………………………………………………….. 3
D. Dimensions…………………………………………………………………… 4
E. Installation……………………………………………………………………. 4
F. Electrical Power Supply……………………………………………………..
5
G. Fuel Gas Supply………………………………………………..……………
6
H. Initial
Setup…………………………………………………………………… 6
I. Ignition………………………………………………………………………… 8
J. Operation…………………………………………………………………….. 8
K. Flame
Monitoring……………………………………………………………. 8
L. Maintenance…………………………………………………………………. 9
M. Recommended Spare Parts………………………………………………... 12
WARNING
These instructions are intended for use only by experienced, qualified combustion start-up
personnel. Adjustment of this equipment and its components by unqualified personnel can result
in fire, explosion, severe personal injury, or even death.
HAUCK MANUFACTURING CO.,
100 North Harris Street Cleona, PA 17042 717-272-3051
3/14
www.hauckburner.com
Fax: 717-273-9882
PBG
II
-9
INSTRUCTIONS
These instructions are intended to serve as guidelines covering the installation, operation, and maintenance of Hauck equipment. While
every attempt has been made to ensure completeness, unforeseen or unspecified applications, details, and variations may preclude
covering every possible contingency.
WARNING: TO PREVENT THE POSSIBILITY OF SERIOUS BODILY INJURY, DO NOT USE OR
OPERATE ANY EQUIPMENT OR COMPONENT WITH ANY PARTS REMOVED OR ANY PARTS NOT APPROVED BY THE
MANUFACTURER.
Should further information be required or desired or should particular problems arise which are not covered
sufficiently for the purchaser's purpose, contact Hauck Mfg. Co.