9
Then attach the Right Foot Bar Set (A06) onto the Right Dual Action Arm Set (A04) with 1 Bolt
M8x92mm(B24),
1 Nut M8xP1.25x7.7t(B29), and 1 Washer 5/16”x20x2.0t(B33) that were removed.
[Tighten bolt and nylon nut with the Hex Tool with Phillips Screwdriver and M5 Allen
wrench provided]
9.) Fit one Nut Cap (C11) onto M8x16mm Hexagon Head Bolts (B32) of the Right Rotate Bar
(A08).
Repeat above steps to install the Left Dual Action Arm Set (A03) onto the horizontal axle of the Front Post (A02)
and Left Wheel Bar Set (A07) onto the Crank (A11) axle.
Remark: Please use the assembly drawings of steps No. 1-9 at Page No. 9.