background image

B

'B' x5

3

'C' x10

B

B

B

B

C

C

C

C

C

C

C

C

C

C

05 - 3V 24

Summary of Contents for 3V 24

Page 1: ...3V 24 0 GREENHOUSE INSTRUCTIONS 3V 24 0...

Page 2: ......

Page 3: ...t Right be liable for any special indirect incidental or consequential damages Upon the expiration of the warranty period Harvest Right s liability under this warranty shall terminate The foregoing wa...

Page 4: ......

Page 5: ...A x30 B x40 C x50 D1 x2 D2 x2 x30 x30 1 x7 2 x6 3 x21 CCCC x5 BABC x5 CBAB x5 x2 DC x1 x1 x1 02 3V 24...

Page 6: ...A A A A A A x5 1 1 x1 1 03 3V 24...

Page 7: ...B B x5 2 3 x5 B B B B 3 3 3 3 3 04 3V 24...

Page 8: ...B B x5 3 C x10 B B B B C C C C C C C C C C 05 3V 24...

Page 9: ...C x10 4 2 x5 C C C C C C C C C C 2 2 2 2 2 3 3 3 3 3 3 x5 06 3V 24...

Page 10: ...A x5 5 B x10 A C x10 B C A A A A B B B B B B B B B C C C C C C C C C 07 3V 24...

Page 11: ...A x10 6 B B B B B B x5 1 x5 3 x10 A A A A A A A A A A 1 1 1 1 1 3 3 3 3 3 3 3 3 3 3 08 3V 24...

Page 12: ...A x10 7 B x10 C C x10 C C C C C C C C C A A A A A A A A A A B B B B B B B B B B 09 3V 24...

Page 13: ...B x5 8 C C C C C C C C C C B B B B B C x10 CCCC x5 BABC x5 CBAB x5 CCCC CCCC C C C C C C C C B A B C BABC B A B C B A B C BABC C B A B CBAB C B A B CBAB C B A B CCCC 10 3V 24...

Page 14: ...D2 D2 DC D1 D1 D1 x2 9 x x x x x D2 x2 DC x1 11 3V 24...

Page 15: ...10 USING THE ROPE PROVIDED PULL COVER OVER FRAME ROTATE COVER SO DOOR AND SEAMS LINE UP CORRECTLY x1 x1 11 12 3V 24...

Page 16: ...WITH THE ZIPPERS CLOSED PULL COVER UNDER FRAME TO INSIDE CLIP COVER AROUND THE POLES 12 x30 x15 x2 13 x30 WRAP COVER AROUND POLES AT WINDOWS USE VELCRO TO SECURE 13 3V 24...

Page 17: ...THE COVER ZIPPED CLOSED SECURE THE FRAME TO THE GROUND USING ANCHORS APPROPRIATE FOR YOUR SOIL CONDITIONS IT IS RECOMMENDED TO CONNECT AT ALL HUB LOCATIONS EACH ANCHOR SHOULD BE ABLE TO WITHSTAND 900...

Page 18: ...VARIOUS SECTIONS CAN BE OPENED FOR INCREASED AIR FLOW 16 15 3V 24...

Reviews: