9.0
Maintenance
Maintenance should be carried out by trained professionals only and all health and safety checks
listed in this manual along with site health and safety processes should be adhered to at all times. It
is imperative before works are carried out on the Skiploader equipment the environment is safe and
secure.
9.1
Greasing
All points on greasing diagram must be greased every 30 working hours. The equipment must also
be greased every 40 days especially if it is subject to long periods of operation or the arduous
environments.
In working conditions with high humidity or presence of aggressive substances the maintenance
intervention must be increased.