background image

Page 3

Code:

Product:

Sportset Beach Volleyball

Post Set Up

1

Place the bottom uprights (3) over the Ground Turf Screws. With
the channel facing away from the court, ensure the locking pin fits
into the slot in the Ground Screw as shown in figure 4.

8

3

Locking Pin

Fig. 4

2

Slide the Top Winder (1) and Top Dummy (2) uprights into the Bottom
Uprights, ensuring the box tube on the Top Uprights locates inside the channel
on the Bottom Uprights. Screw the M10x25mm Handwheels (4) into the

tapped hole in the channel on the Bottom Uprights, DO NOT tighten the
Handwheels at this stage.

4

1

3

2

Fig. 5

10m

VOL-175

Reviews: