![Harrod FBL-699 Assembly Instructions Manual Download Page 6](http://html.mh-extra.com/html/harrod/fbl-699/fbl-699_assembly-instructions-manual_601263006.webp)
Code
Product
FBL-699
3G Weighted UEFA Portagoal
Assembly Instructions
1
Slide two M10x25mm Square Screws (J) into the Crossbar (1) channel and two into each
Upright (2,3). Slide the Uprights over the plate in the Crossbar, leaving no gap. Place an L Plate
(A) over the Square Screws, locating it in the channel of the Crossbar and Upright. Secure the
Uprights to the Crossbar using four M10 Nyloc Nuts (M), three M10 Washers (L) and a Net Holder
Clip (D) per Upright. Leave the top of the Net Holder Clip open for fitting the net at a later stage.
Page 5
1
17mm
2
Slide the Ballast Tube (10) into the Backbar (5), ensuring the Ballast tube sits centrally in the
Backbar. Slide one Solid Ballast (9) into each end of the Ballast Tube within the Backbar.
3
M
A
D
L
J
2
1
3
8
9
5