
Code
Product
FBL-698
Portagoal Bottom Hinged Net Support
7
Locate the Net Bar Brackets in the channel of the Sidebars. Fix the Net Sidebars to the
Folded Brackets using an M8x55mm Hex Bolt, Two M8 Washers (L), two M8 Nylon Washers,
an M8 Nyloc Nut and an M8 Nutcap per Net Sidebar.
Page 7
13mm
2
G
M
K
J
L
8
Slide the M10 Square Screw in the rear of the Sidebar into the slot in the Net Bar Brackets.
Screw the M10 Handwheel (E) onto the M10 Square Screw to fix the Bottom Hinged Net
Support down.
E