pg. 15
Figure 8
– Registration Code
5.
Telemetry Configuration:
Select the appropriate configuration for your setup:
a. AMS is the integrated telemetry system (recommended)
b. Standalone telemetry with integrated sensor (user will connect using DataSmart
sensors)
c. Standalone telemetry with end-user sensors (user will connect their sensors)
6.
User Selectable Features:
Configure the settings for operation:
a. Unit of Measurement
– select Imperial or Metric
b. System Priority
– select the side of the distribution system that DataSmart should
prioritize for gas delivery: Left Bank; Right Bank; First In, First Out (FIFO).
NOTE: Liquid cylinders or bulk systems should always be the priority bank, i,e., a liquid
dewar that is on the left side should be set up as Left Bank Priority. If there are liquid
dewars on both sides, then priority should be set as FIFO.
c. Bank Configuration
– DataSmart will enter bank configuration based upon System
Priority selection. Select Gas Source and Gas Type for each bank based upon your
setup. The available Gas Types are determined by the Gas Source selection.
Note:
Bulk System or Liquid Dewar should always be set as the Gas Source on the
PRIMARY
bank.
Summary of Contents for DataSmart 763
Page 19: ...pg 19 APPENDIX B Wiring Diagram...
Page 21: ...21 Appendix D Piping and Instrumentation P ID Diagram...
Page 25: ...25 Step 2...
Page 31: ...31...
Page 33: ...33 Available UoM in Imperial For Pressure PSIG only For Flow SCFH SCFM...
Page 46: ...46 Cylinder Bank graphics Liquid Dewar graphics Bulk System graphics Machine Name Machine Name...
Page 50: ...50...
Page 53: ...53...
Page 54: ...54 Edit Username Password Edit Frame Generation Frequency Edit Telemetry Type...
Page 55: ...55 Pressing returns the user to the previous screen...