Summary of the Installation Procedures
3-7
INSTALLATIO
N
AND
COMMISSIONING
Summary of the Installation Procedures
is a summary of the installation procedures.
Table 3-4: Installation procedures
Step
Procedure
For Details,
Go To
1
Ensure that the power breaker is off or that the fuse is
removed.
2
Install the Constellation Radio rack as specified in the
Sales Order Specific Information (Engineering Work
Order).
3
Ground the radio rack.
4
Open and remove the Constellation doors.
5
Connect the interconnection cables to the
Constellation backplane.
6
Connect the Constellation radio to other equipment.
7
Connect the customer-configured alarm wires.
8
Connect the Constellation to the antenna or to a
dummy load.
9
Test the office battery voltage.
10
Connect the battery power wires to the Constellation.
Summary of Contents for Constellation
Page 1: ...Point to Point Digital Radio Constellation Installation Maintenance...
Page 2: ......
Page 4: ...Constellation November 2003...
Page 18: ...Constellation November 2003 xii List of Figures...
Page 24: ...Constellation November 2003 xviii Preface...
Page 26: ...Constellation November 2003 xx Preface...
Page 96: ...Constellation November 2003 4 12 Loopback Testing...
Page 110: ...Constellation November 2003 5 14 Configuring the Constellation Radio...
Page 134: ...Constellation November 2003 7 14 SNMP Based Network Management...
Page 210: ...Constellation November 2003 11 36 Field Replaceable Units...
Page 238: ...Constellation November 2003 A 16 Wiring Specifications...
Page 260: ...Constellation November 2003 C 10 Hardware Compatibility Tables...
Page 276: ...Constellation November 2003 Glossary 6...
Page 291: ......