8
D-H 22 S - 16.02.2002 / Vers.: 1
2.4 Initial/setting into operation procedure
(See figures 1 and 2, on pages 5 and 6)
1. Connect unit to compressed air supply (see section “3.1“).
2. Fill with blasting agent (see section “3.2“).
3. Connect foot switch to socket (1) (located during transport in blasting chamber)
4. Establish connection to mains supply (230 V/50 Hz) using the mains supply
connection cable delivered with the unit (socket(15)).
5. Check the filter unit (see section “3.3“).
6. Actuate main switch (12).
Note
Switching the unit on at the main switch renders it electrically ready for
operation.
7. Suction is activated. Internal illumination lights up.
8. Adjust working pressure (blasting pressure) at pressure regulator (6) to desired
value.
The working pressure is controlled by manometer (5).
Note
The working pressure should not be set to more than 5 bar.
9. The sanding jet (exits the injector) is released by actuating the foot switch.