SL600 • Pinnacle Stair Lift Installation Manual
19
Pinnacle Stair Lift
FOLDING RAIL INSTALLATION
12. Reinstall the two plastic caps on the feet to
cover the threads.
[Figure 19-1]
13. Carefully move the fork with your hand to make
sure it operates smoothly. Allow it to go all the way to
the floor. Confirm that both feet sit level on the floor
and the hinge-joint is fully straight.
[Figure 19-2]
Figure 19-2
Figure 19-1
14. Install the folding rail parts onto the Pinnacle
chassis. Shown here is just a bare Pinnacle chassis to
make the pictures more clear.
[Figure 19-3]
First, with a 5/16
"
Allen wrench, remove the two
large cap screws from the wall-side of the unit, then
install the folding rail side-plate, but don't tighten
them yet.
15. Install the #8 screw, then tighten it and the
two Allen head bolts. If your Pinnacle stair lift is
still installed on the track, you'll have to use a short
wrench and maybe a right-angle screwdriver.
[Figure
19-4]
16. Ensure the folding rail sensor is on the bottom
safety obstruction panel.
[Figure 19-5]
17. Follow the normal procedure for installing rail
brackets and tightening them. This procedure is
detailed on pages 5 & 6 (steps 7 & 8).
18. Test ride the unit a couple of times to verify that
the folding rail is operating properly.
WARNING
Be careful not to pinch your fingers
when moving the fork.
Figure 19-3
Figure 19-4
Figure 19-5
NOTE
-
When you test run the chassis, ensure
the roller enters the fork and not above or below,
causing damage.