4
| www.harmar.com | 800-833-0478
Part Number: 630-00008- Rev A
Preparation
lifts shall be installed so that means of egress is maintained as required by the
authority having jurisdiction.
the structure which equipment is installed shall be capable of supporting the
loads imposed.
the installation of electrical equipment and wiring shall conform to the require-
ments of NFPA70
Foot rest clearance.
At no point in its travel shall the edge of the footrest facing
the upper landing be more than 24 inches (600 mm) above the step or landing as
measured vertically.
tooLS reqUIreD
•
Ratcheting Allen Wrench (metric)
•
Snap ring pliers
•
drill and drill Bits
•
emery/Sandpaper
•
lightweight Grease
•
towels for cleaning
•
tape Measure (inches and
centimeters)
•
Angle Meter
•
Mirror for checking charger
•
Wire Stripper/crimper
•
Fish tape
•
drill extension Bit
•
Mounting Screws could be needed,
based on flooring
•
Shims
•
Picks
•
optional pull strap / Ratcheting Strap
•
Recommended volt ohM meter