3-90-70746R11_06/13

2.3 ASSEMBLY.

Slide the blower into the slotted bracket on the rear of the 

stove. The blower will rest at the bottom of the slot.

2.4 GENERAL INFORMATION.

Installation Checklist:
A. Have your stove installed by a trained installer. Preferably 

one who is certified by the National Fireplace Institute or 

similar certification agency.

b. before starting Installation, check for proper clearance to 

combustibles where the stove is going to be located.

C. Never  vent  a  solid  fuel  burning  appliance  into  a  flue 

serving another appliance. 

D. Have  the  chimney  inspected  and  thoroughly  cleaned. 

Inspect that it is a Class “A” chimney either masonry or 

factory built. If it is a manufactured chimney, ensure that 

it is installed as per the manufacturers requirements. be 

sure that the chimney is tall enough. Solid fuel chimneys 

fall under a general rule, 16 ft. minimum height, 2 ft. taller 

than anything within 10 ft., and 3 ft. above where it passes 

through the roof line. The chimney must be capable of a 

minimum .06 inches of water column of draft when the 

stove is burning.

Installation

E. Limit the amount of connector pipe. Position the stove as 

close to the flue as possible. (8 ft. or less)

No more than two 90° elbow fittings should be used.
Any horizontal connector pipe should have at least 1/4 in. of 

rise per foot in length. A barometric damper may be installed 

to prevent excessive or erratic draft. 

MANUAL DAMPERS OR “HEAT SAVERS” MUST 

NEVER BE INSTALLED IN THE FLUE PIPE. IMPROPER 

OPERATION COULD RESULT IN DEATH.

The  viewing  glass  is  installed  between  the  door  and  the 

window  frame.  The  glass  gasket  is  installed  only  on  the 

sides of the glass panel. The top and bottom of the glass are 

open to provide air-wash and secondary air to the firebox. 

The glass frame is secured to the door with four bolts. 
The Mark II and Mark III also have a top trim piece which 

bolts onto the top of the door. 
be sure the frame bolts and trim bolts are secured.

The  shaker  handle  bolts  onto  the  shaker  block  using  the 

bolts and lock washers provided.
The draft control is bolted through the hole in the center of 

the ash door as shown below. The knob should spin freely 

and  open  to  a  distance  of  about  1/4  inch  from  the  door 

surface, while being able to close against the face of the 

door.

More than 10 Ft. (3 m)

10 Ft. (3 m)

2 Ft. (.6 m) Min

Height necessary 

above any roof surface 

within 10 Ft. (3 m)

3 Ft. (.9 m) minimum 

above exit point

Ridge

Chimney

The three foot, two foot, ten foot rule

Summary of Contents for Magnafire MARK I

Page 1: ...HORITY SUCH AS THE MUNICIPAL BUILDING DEPARTMENT FIRE DEPARTMENT FIRE PREVENTION BUREAU ETC TO DETERMINE THE NEED FOR A PERMIT CETTE GUIDE D UTILISATION EST DISPONIBLE EN FRANCAIS CHEZ VOTRE CONCESSIO...

Page 2: ...3 90 70746R11_06 13...

Page 3: ...S ET DE L INSPECTION D INSTALLATION DANS VOTRE VOISINAGE PR VENTION DES FAUX DE MAISON Installez et utilisez en accord avec les instructions d installation et d op ration du fabricant et des codes loc...

Page 4: ...2 3 Assembly 2 4 General Information 3 Venting 3 1 Types of Chimneys 3 2 Common Chimney Problems 3 3 What To Do If You Have A Problem 3 4 Chimney Details 4 Grates 4 1 Grate System and Controls 5 Oper...

Page 5: ...ease the amount of fresh air in the room during this initial break in period This may be achieved by opening doors or windows 1 4 Mobile Homes This stove is not approved for use in mobile manufactured...

Page 6: ...ctor pipe Position the stove as close to the flue as possible 8 ft or less No more than two 90 elbow fittings should be used Any horizontal connector pipe should have at least 1 4 in of rise per foot...

Page 7: ...umn WC To measure the draft drill a hole in the connector pipe and attach a draft meter First check the draft above the barometric damper if installed Then check it below the barometric damper and mak...

Page 8: ...oxygen getting to the fire E Remember open the draft control and crack the door open slightly before reloading or checking the fire F Check the ashes The ash pan and firebox may be overloaded with as...

Page 9: ...al bed should be bright and vigorous If the fire is burning hot and there is a deep bed of hot coals full loads of coal can be added at any time However if there is not a deep bed of coals it is best...

Page 10: ...blower and clean the fan If there are pets in your house you may want to check this more frequently Grates Keep ash pan emptied Twice a day Chimney and connector Avoid chimney fires On a regular sche...

Page 11: ...Magnafire Series Coal Stoves 11 3 90 70746R11_06 13 Optional Water Coil 7 Optional Hot Water Coil Plumbing Diagrams Inside Nut Stove Body Packing Outside Nut Washer...

Page 12: ...e higher than the top leg of the coil The tank should be elevated if necessary to allow for proper thermo siphon action the method by which water will circulate automatically through the system Circul...

Page 13: ...ty coverage begins on the date of first occupancy of the dwelling or six months after the sale of the product by an independent authorized HHT dealer distributor whichever occurs earlier The warranty...

Page 14: ...y does not cover the following Changes in surface finishes as a result of normal use As a heating appliance some changes in color of interior and exterior surface finishes may occur This is not a flaw...

Page 15: ...available 3 00 00038 4 Rect Glass 7 1 4 X 10 1 2 3 40 7251050 Y 3 Spring Handle 1 2 Pkg of 3 3 40 00086 3 3 4 Short Shaker Handle Weldment 1 10 01001 Y 5 Ash Door Roped 1 10 08143A Draft Control Cast...

Page 16: ...00 900450125 Y 414 Pcs 3 40 900450 414 brick Angles Qty 2 req 2 00 01100 2S brick bracket 2 00 01006 brick Set 1 00 00836 Y Door Handle Cast 4 00 00042 Y Door Hinge Qty 4 req 2 00 07203D Door Latch 4...

Page 17: ...0 8501494 Y Rect Glass 4 1 2 X 8 1 2 Triple Frame 3 40 450850 Y 3 Spring Handle 1 2 Pkg of 3 3 40 00086 3 3 4 Short Shaker Handle Weldment 1 10 01001 Y 5 Ash Door Cast 4 00 00213D Y Draft Control Cast...

Page 18: ...42 Y Door Hinge Qty 4 req 2 00 07203D Door Latch 4 Sets 1 00 00036 Y Door Pin 3 8 x 2 1 4 Load Door Pkg of 4 4 30 00138A Y Gasket 1 2 Round Rope Load Door Ash Door 20 Ft 1 00 53500 Y Gasket Glue 32 oz...

Page 19: ...Control Cast 4 00 00109 1 Draft Control Gold No longer available 3 00 00109 4 Additional service parts on following page 11 12 Magnafire Freestanding Coal Stove 1 70 03227 1 Black Ending Manufacturing...

Page 20: ...Set of cut 1 00 00838 Y brick bracket 2 00 01006 Door Handle Cast 4 00 00042 Y Door Hinge Qty 4 req 2 00 07203D Door Latch 4 Sets 1 00 00036 Y Door Pin 3 8 x 1 7 8 Ash Pan Pkg of 4 4 30 00138b Y Door...

Page 21: ...Magnafire Series Coal Stoves 21 3 90 70746R11_06 13 Service Maintenance Log Date Of Service Performed By Description Of Service...

Page 22: ...Magnafire Series Coal Stoves 22 3 90 70746R11_06 13 Service Maintenance Log Date Of Service Performed By Description Of Service...

Page 23: ...3 90 70746R11_06 13...

Page 24: ...inted On 100 Recycled Paper At Harman we build each product to a standard not a price Signature of Boxer Your premium quality hearth product designed and assembled by the experienced and skilled membe...

Reviews: