Installation

Getting Started

 

The sheet metal sides and top are easily 

removed to reduce the chance of dents and/or 

scratches in the finish. Simply lift the top off, and 

that will allow the sides to be pulled away and up, 

for removal. To re-install, slide the channel, at the 

bottom of each side piece, over the lip at the bot-

tom of the boiler, and hold downward while mov-

ing the side panel into place. Then slide the top 

down over the sides. 

NOTE: The sheet metal top holds the sides in 

place, thus, no bolts or screws are needed. 

Caution: Boiler should not Be 

installed Closer than 36 inChes 

(915 mm) to any ComBustiBle ma-

terial

Locating Boiler

 

Place the boiler as close to the chimney as 

possible, while still maintaining the above men-

tioned clearances. Bolt the shaker handle on to 

the block on the side of the boiler, using the (2) 

5/16 X 3/4 in. bolts and lock-washers.

Assembly

 

Install the Temperature/Pressure Gauge 

into the pipe stub in the center of the round plate 

on the front of the boiler (FIG. 1)

 

Install the A350 sensor wire all the way into 

the immersion well and screw the well into one of 

the top holes on the face of the boiler.

 

Turn the pressure relief valve into the stub 

on top of the boiler, next to the supply outlet fit-

ting.

NOTE: Use teflon tape to seal the threads 

on all fittings. Any unused fittings must be 

plugged.

 

Bolt the two manual draft controls

through the holes in the top load door. (FIG.2) 

The draft control knob should spin freely and 

open to a distance of approximately 3/8 in. from 

the door surface, while being able to close against 

the door surface.

FIG.

/8 to 1/ in.

Immersion Well

Temp/Pressure Gauge

Optional Electric 

Back-up Elements

Automatic Draft Control

Pressure Relief Valve

FIG.1

Johnson Controls 

Aquastat and 

Terminal Block

Shaker   Handle

Domestic Hot Water 

Coil Option

Summary of Contents for SF160

Page 1: ...OPERLY INSTALLED A HOUSE FIRE MAY RESULT FOR YOUR SAFETY FOLLOW INSTALLATION DIRECTIONS CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA Contact your local authority such as municipal building department fire department fire prevention bureau etc to determine the need for a per mit Cette guide d utilisation est disponible en francais...

Page 2: ... ...

Page 3: ... Company recommends that the installation be performed by a plumbing and heating expert The Harman Trident Boilers are designed to operate safe easy and automatically You may however need to learn a few basic skills to maintain a fire Especially if this is your first venture into solid fuel burning If you have any problems re read these instructions If you can not resolve the issue s Contact your ...

Page 4: ...elief Valve 30 psi Temperature Pressure Gauge Automatic Draft Control Assembly 1 pc Flex Conduit w 2 90 Fittings w nuts and 3 Chase Nipples w nuts 2 Manual Draft Control Knob Assembly 3 Brass Coil Spring Handle Ash Pan Warranty Registration Form Notice The Aquastat controls supplied with the Trident Boiler are designed only to maintain water temperature within the boiler The actual heating sys tem...

Page 5: ... the boiler using the 2 5 16 X 3 4 in bolts and lock washers Assembly Install the Temperature Pressure Gauge into the pipe stub in the center of the round plate on the front of the boiler FIG 1 Install the A350 sensor wire all the way into the immersion well and screw the well into one of the top holes on the face of the boiler Turn the pressure relief valve into the stub on top of the boiler next...

Page 6: ... the din rail on a flat surface with the flat side down Secure one end clamp on the left side Slide the A350 controller onto the rail from right to left until it is against the end clamp Slide the Y350 onto the rail and guide the plug in connector joining it to the A350 Next install the S350 again guiding the plug in connector carefully Install the other end clamp to the right side of the din rail...

Page 7: ...rheat dump would stop With the differen tial set at 15 using the temperatures above the circuit would re open stopping the overheat dump at a water temperature of 185 The 120V wiring is attached on the normally open and the common position The normally closed position is not used Re install the covers onto the three Con trols Optional Items There is a domestic hot water coil available for your Tri...

Page 8: ...l plumbing diagram for tying into an existing system This method provides water circulation between the two boilers with a circulating pump In this setup the domes tic water coil in the existing boiler will be heated making it unnecessary to install a water coil in the Trident Boiler Tying in to an existing boiler must be done in the return line between the circulator and the existing boiler Run a...

Page 9: ...trol whether open to increase heat or closed to decrease heat The S350 is used as overheat protection Since a wood or coal fire is still producing heat when the draft is closed this overheat protection is required You could have the S350 energize a circulating pump or a zone valve separate from the heating system or it could be hooked up so that it flows the heated water throughout the system Eith...

Page 10: ...top of the newspaper Be sure this kindling is dry and no more than 3 4 in in diameter Layer the kindling in a criss cross type pattern to allow maximum air flow Next lay some larger pieces of wood on top of the kindling approximately 2 in diameter Using a match or lighter light the paper just inside the door Close and latch the firebox door and al low the fire to burn a few minutes After about fiv...

Page 11: ...1 complete turn from closed Adjust both controls equally Loading Coal should never be added unless there is a reasonably hot fire The coal bed should be bright and vigorous If you have an active coal bed full loads can be added at any time If not add new coal in layers as described in starting a coal fire Shaking the Grates Shaking should be done only when there is a well established fire The freq...

Page 12: ...g the first few hours of burning a blue smoke may be observed rising from the boiler This is the paint going through the curing process It is advisable to increase the amount of fresh air in the room during this break in period This can be achieved by opening doors and windows Don t be alarmed this is normal and will only last a short while Chimney Problems Not Enough Draft Chimney is too low The ...

Page 13: ...available for replacement from your Harman dealer Gaskets on the doors are there to regulate air to the firebox If a gasket is failing you ll notice difficulty in controlling the fire Inspect the gaskets regularly and replace with Harman supplied mate rial only Specifications SF 160 SF 260 SF 360 Heating Capacity Square Feet 2200 Max 3200 Max 4500 Max Approximate BTU per hour wood or coal 90 000 1...

Page 14: ...his warranty shall be made to the dealer from whom this appliance was purchased Then contact is made with the manufacturer giving the model serial number date of pur chase dealer s name and address plus a simple explanation of the nature of the defect SHIPPING COSTS The transportation charges are as follows 1 Customer Pre pays freight to Harman Stove Company 2 Harman Stove Company Pre pays charges...