MKIV hydraulic unit 3
24
Assembly
Attach Hydraulic Cylinder
Position cylinder to match chainplate direction.
Chainplate runs fore/aft:
Position the guide
rod so it is to the port side.
Hydraulic connections will be on the aft
side. Line up insulator and secure cylinder
assembly to lower unit using blue Loctite
®
adhesive on screws.
Chainplate runs athwartships:
Position the
calibrated guide rod so it is aft. Hydraulic
connections will be on the
starboard side.
Chainplate fore/aft orientation
Chainplate athwartships
orientation
Loctite is a registered trademark of Henkel AG & Company KGaA.