
5 - Operation
5.9
Agitation before re-starting spraying
If a spraying job has been interrupted for awhile, severe sedimentation
can occur depending on chemicals being used. When re-starting spray
job, it might be necessary to agitate sedimented material first.
1
.
Make sure the control unit is switched off.
2.
Turn the Suction valve handle towards “Suction from main tank”.
3.
Adjust the top Pressure Agitation valve - clockwise (in) for less
agitation, counter-clockwise (out) for more agitation.
4
.
Engage pump and set to normal operating level.
5
.
Agitation will start and should be continued for at least 10 minutes.
6.
Once the chemicals are mixed, spraying can resume.
Operating the control unit while spraying
The switches on the spray control box control the following functions:
1
.
Power switch
2.
Manual pressure regulation
3.
Main ON/OFF
4
.
End nozzle (Left/OFF/Right)*
5
.
Foam marker regulation*
6.
Foam marker (Left/OFF/Right)*
7.
Boom section valves
8
.
Valve function A-B*
*optional equipment
In order to close the entire boom, switch ON/OFF (3) to OFF position.
This returns the pump output to the tank through the return system. The
diaphragm Non-drip valves ensure instantaneous closing of all nozzles.
In order to close one or more sections of the boom, switch the relevant
distribution valve (7) to OFF position. The pressure equalization ensures
that the pressure does not rise in the sections which are to remain open.
On the sprayer, the Suction valve should be turned towards “Suction
from Main tank”. Adjust the top Pressure Agitation valve - clockwise (in)
for less agitation, counter-clockwise (out) for more agitation.
Summary of Contents for Ranger 550
Page 1: ...RANGER 550 Instruction book 67022203 Version 1 00 US 01 2011 ...
Page 2: ......
Page 4: ......
Page 10: ...1 Welcome 1 2 ...
Page 44: ...6 Maintenance 6 2 Trailer lubrication oiling plan ...
Page 58: ...6 Maintenance 6 16 ...
Page 71: ...8 Technical specifications 8 9 Charts Boom hydraulics HZ Boom hydraulics HV ...
Page 75: ......