6 - Maintenance
137
Feed Pipe Clamp Assembly
A feed pipe can be removed from the pipe clamps the following way:
1.
Use a flat bladed screwdriver to prize the cover off the first corner
(A).
2.
Hold the clamp top with your hand and prize off the opposite
corner (B) with the screwdriver.
3.
Prize off the other side of the pipe clamp with the screwdriver.
4.
Take out the feed pipe.
Feed Pipe Snap-Lock Assembly
Disassembly
1.
Unscrew the union nut (A) completely.
2.
Pull the feed piping and hose barb apart.
3.
Take out the O-ring (B).
4.
Inspect and oil O-ring (B). Change the O-ring (B) if worn, before
reassembly.
Reassembly
1.
Check that the barbed lock ring (C) is fitted to the feed pipe with
barb pointing away from pipe opening.
2.
Fit the oiled O-ring (B) on top of the lock ring (C).
3.
Push the feed pipe and hose barb together.
4.
Screw the union nut (A) on the hose barb and tighten union nut
(A) by hand.
Initial Assembly of Fittings
ATTENTION! This method can only be used for pipes not fitted
into pipe clamps.
1.
Fit the barbed lock ring (C) to the feed pipe with barb pointing
away from pipe opening.
2.
Fit the oiled O-ring (B) on top of the lock ring.
3.
Screw the union nut (A) on the hose barb.
4.
Press the feed pipe and hose barb together.
5.
Tighten the union nut (A) by hand if needed.
Summary of Contents for MEGA VPZ NK
Page 4: ...1 EU Declaration 4...
Page 10: ...Table of Contents 10...
Page 42: ...2 Safety Notes 42...
Page 68: ...3 Description 68...
Page 118: ...5 Operation 118...
Page 121: ...6 Maintenance 121 Lubrication Plan Boom Centre Close up of Glide Shoes to be Lubricated...
Page 172: ...8 Technical Specifications 172...
Page 176: ...Index 176...
Page 178: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 N rre Alslev DENMARK...