
8
GB 04 00 MA
Description
Unloading the spr
Unloading the spr
Unloading the spr
Unloading the spr
Unloading the spra
aa
a
ayyyyyer fr
er fr
er fr
er fr
er from the tr
om the tr
om the tr
om the tr
om the truc
uc
uc
uc
uck
kk
kk
Lifting points
Lifting points
Lifting points
Lifting points
Lifting points
For the unloading of the sprayer, you need a crane or a
fork lift.
When unloading with a crane please observe the two
lifting points (
A
) as shown on the picture below, and
make sure that the straps or belts used for lifting are
strong enough.
Bef
Bef
Bef
Bef
Befor
or
or
or
ore putting the spr
e putting the spr
e putting the spr
e putting the spr
e putting the spra
aa
a
ayyyyyer into
er into
er into
er into
er into
oper
oper
oper
oper
opera
aa
a
ation
tion
tion
tion
tion
Although the sprayer has been applied with a strong and
protective surface treatment on steel parts, bolts etc. in
the factories, it is recommended to apply a film of
anticorrosion oil (e.g. CASTROL RUSTILLO or SHELL
ENSIS FLUID) on all metal parts in order to avoid
chemicals and fertilisers discoloring the enamel.
If this is done before the sprayer is put into operation for
the first time, it will always be easy to clean the sprayer
and keep the enamel shiny for many years.
This treatment should be carried out every time the
protection film is washed off.
T
T
T
T
Terminology used in this book
erminology used in this book
erminology used in this book
erminology used in this book
erminology used in this book
Boom wing
Boom wing
Boom wing
Boom wing
Boom wing
A - Breakaway section
B - Short outer section (2)
C - Large outer section (1)
D - Intermediate section
E - Centre section
T102-0025
A
A
A
B
C
D
E
T102-0026
Summary of Contents for MASTER VHY Series
Page 2: ...2...