
6 - Maintenance
6.9
Adjusting boom level to ground (All booms)
Unfold the boom and check that the boom sections are parallel to the
center frame and level to the ground. Adjust if necessary, as described
below. Adjustment is carried out with the boom unfolded.
For SPB-HY & SPC-HY models, the following procedure is used:
1.
Loosen lock nut (A).
2.
Adjust nut (B) - in or out - until boom wing is level to the ground.
3.
Secure lock nut (A) again. Same procedure applies to both sides.
For SPB-HZ & SPC-HZ models, the following procedure is used:
1.
Ensure that cylinder is fully extended.
2.
Loosen jam nut (A).
3.
Apply an adjustable wrench to the machined surface at (B).
4.
Turn the cylinder rod until boom is level to the ground.
5.
Secure jam nut (A) again. Same procedure applies to both sides.
For 120’/90’ Dual Fold SPC-HZ model, the following procedure is used:
1.
Ensure that cylinder is fully extended.
2.
Loosen set screw (A).
3.
Apply an adjustable wrench to the machined surface at (B).
4.
Turn the cylinder rod until boom is level to the ground.
5.
Secure set screw (A) again. Same procedure applies to both sides.
Summary of Contents for EAGLE SPB BOOM
Page 2: ......
Page 4: ......
Page 8: ...1 Welcome 1 2 ...
Page 16: ...3 Description 3 6 ...
Page 36: ...6 Maintenance 6 2 120 90 90 60 Dual Fold SPC Boom lubrication oiling plan 120 90 90 60 ...
Page 46: ...6 Maintenance 6 12 ...
Page 50: ...7 Fault finding 7 4 ...
Page 57: ...8 Technical specifications 8 7 Electrical specifications for boom and work light Trailed ...
Page 58: ...8 Technical specifications 8 8 ...
Page 61: ......