26
4.10. Frost Precautions
During periods when there is a risk of freezing the following precautions should be taken:
1. Prepare 50% anti-freeze solution.
2. Remove nozzle or gun attachments from the delivery hose.
3. Lower the water level in the tank.
4. Fill the anti-freeze tank to maximum with the 50% solution.
5. Move the T-Port valve in the suction line to the upwards towards the antifreeze
position and remove the lid from the Anti-freeze tank.
6. Ensure you hold the end of the jetting hose firmly in your hand.
Start the engine and immediately press the water on button. Water will exit the hose
instantly & the level on the antifreeze will begin to decrease rapidly.
When the water runs blue insert the end of the hose into the Antifreeze tank.
7. Allow the antifreeze to circulate for a minimum of 30 seconds.
8. Operate the jump jet kit for a few seconds to antifreeze the jump jet circuit
9. Quickly fully unwind the unloader to protect these lines.
10. As soon as it is fully unwound. Shut down the engine.
11. Select freewheel on the hydraulic lever Manually rewind the hose reel.
12. Secure the hose end in the correct place on the frame.
13. Ensure the hydraulic valve is taken out of the freewheel position.
T-Port Valve Handle
Summary of Contents for Eliminator VanPack
Page 5: ...5...
Page 11: ...11 NP25 Gearbox Detail Hydraulic Diverter Valve 069 581...
Page 12: ...12 Hawk Safety Relief Valve 035 401...
Page 13: ...13 Speck Unloader Valve UL221 035 185...
Page 38: ...38 9 Circuit and Wiring Diagrams...
Page 40: ...40...
Page 41: ...41...
Page 55: ...55...
Page 56: ...56...
Page 57: ...57 11 Service Documents 11 1 Service Checklist...
Page 58: ...58 11 2 Service Logbook...