![HARBEN 903-1315 Operation & Maintenance Manual Download Page 20](http://html.mh-extra.com/html/harben/903-1315/903-1315_operation-and-maintenance-manual_596163020.webp)
20
4.5. Pre-start Checks & Procedures
4.5.1. Starting the Engine
Pre-start Checks
Ensure the open-ended high-pressure hose is in a safe position, preferably within sight of the
operator at the control panel.
Indirect Injection Diesel Engine Key Start Module Operating Procedure
1. Rocker Switch (Bottom Right of Panel) is the Master On/Off (0)
2. In position (1) (On) auxiliary circuits will be energized, screen will be illuminated.
3. Enter the 4-digit PIN using the up and down arrows to select numbers and the enter
button to select
4. Momentarily press the Green button on the Controller, this will automatically run
through pre-heat and prestart When cold. Engine will start automatically and idle at a
pre-determined engine rpm. **Water will now be circulating through the pump and be
diverted back the water tank
Summary of Contents for 903-1315
Page 5: ...5 ...
Page 11: ...11 NP25 Gearbox Detail Hydraulic Diverter Valve 069 581 ...
Page 12: ...12 Hawk Safety Relief Valve 035 401 ...
Page 13: ...13 Speck Unloader Valve UL221 035 185 ...
Page 38: ...38 9 Circuit and Wiring Diagrams ...
Page 40: ...40 ...
Page 41: ...41 ...
Page 55: ...55 ...
Page 56: ...56 ...
Page 57: ...57 11 Service Documents 11 1 Service Checklist ...
Page 58: ...58 11 2 Service Logbook ...