background image

Step

 

4

:

DO

 

NOT

 

use

 

any

 

power

 

tools

 

as

 

this

 

may

 

damage

 

the

 

bed

 

frame

 

and

 

will

 

invalidate

 

any

 

claims.

 

4

 

OF

 

4

To

 

attach

 

the

 

metal

 

frame

(

14

/

15

/

16

/

17

)

 and

 

cross

 

support

 

bar

(

5

)

to

 

the gas

 

lift

 

pre

-

fixed

 

to

 

the

 

side

 

rails

you

 

will

 

need

 

to

 

use

 

hardware

 

parts

 

K

E

 

and

 

J

 

with the

 

M5

 

allen

 

key

(

A

and

 

the

 

spanner

(

F

). 

A

F

E

K

M5

 

Allen

 

Key

    (

1

 

pc

)

Nuts

(

8x13

)

    (

6

 

pcs

)

Spanner

(

8x13

)

    (

1

 

pc

)

Bolts

(

M8x70mm

)

    (

4

 

pcs

)

5

5

A

A

A

K

J

K

To assemble the slats(9) place a single plastic cap(L) onto each 

To

 

attach

 

the

 

pull

 

strap

(

12

to

 

the

 

back

 

frame

 

rail

(

15

)

you

 

will

 

place

 

the

 

pull

 

strap

(12)beneath the metal frame and then

 pull the strap on the inner side of the frame through the strap on

 

the outer side of the frame to form a knot.

end of every slat then 

you

 

need 

to

 

push 

the

 

double slat caps(M) into 

 

the

 

metal frame.

Tilt

 

the

 

bedframe

 

on

 

to

 

its

 

side

 

and

 

attach

 

the

 

fabric

 

base

(

13

).

Step

 

5

:

DO

 

NOT

 

use

 

any

 

power

 

tools

 

as

 

this

 

may

 

damage

 

the

 

bed

 

frame

 

and

 

will

 

invalidate

 

any

 

claims.

13

9

L

9

M

L

12

15

J

Bolts

(

M8x45mm

)

     (

2

 

pcs

)

5

9

Slats

(

28

 

pcs

)

L

Single

 

Plastic

 

caps

     (

28

 

pcs

)

M

Double

 

Plastic

 

caps

     (

14

 

pcs

)

Reviews: