background image

F3x2

S3 x2

S3

11 x2

11

12

10

W5

11

W4

W5

W1

W1

11

10

W1

W5

W5

W1

W1

W4

11

S8L

x2

S3

8

F3

S3

P1

P4

12

3

12

13

11

11

Installation for rail 11#

Insert rail profile 11# into the 
grooves of profile 10#.

Roof corner plastic caps 

S3 installation.

-19-

Summary of Contents for HANGHGBMN-1WHT

Page 1: ...20 x W62 x H169 9820510 Assembly Instruction the assembly of the whole product quantity as mentioned in the list Do not tighten the steps until completing on IMPORTANT Please ensure that you find all...

Page 2: ...ipt if available Name and address of the Purchaser Name of retailer Or call our Customer Service team between 9 00 AM and 5 00 PM Eastern Time Monday through Friday at 1 877 397 5144 or visit our webs...

Page 3: ...house in an area exposed to excessive wind drugs or alcohol or if you are prone to dizzy spells If using a step ladder or power tools ensure that you follow the manufactures safety advice in the green...

Page 4: ...R POLYCARBONATE PANEL Towards the white film side to the sun as it is UV protected P1 P4 P3 P6L P6R P3 P5 522mm 2 2 TOP 726mm 13 2 1102mm 522mm 5 1 14 2 TOP 6 1 726mm 22mm 7 2 1102mm 8 1 154mm 9 2 106...

Page 5: ...B5 B10 B11 D2 B5 F3 F3 B11 x2 Base and Frame Assembly Anchor Installation Attach the anchor B5 to the corner of base B10 fix B5 anchors onto B10 and D2 by F3 screws Make sure all holes are all in alig...

Page 6: ...Attach D2 B12 with 12 pieces F7 screws Workbench Assembly Align holes for D2 and B12 Panels of platform B12 Installation B7 x1 P6 F7 x12 F5 x8 x6 F7 F7 B12 D2 x8 F5 F5 F5 F5 F5 P6 P6 P6 B7 B7 B12 B12...

Page 7: ...D2 F7 F7 B7 x2 D2 B7 F7 B7 B7 D2 D2 F7 F7 P6 F5 F5 F5 F5 P6 P6 B7 B12 B7 F7 F7 7 Install the last piece 4 pcs F7 screws the two frames D2 with of wall panel B7 and Fix the bottom panel P6 to the last...

Page 8: ...pcs P8 panels for each wall Step 3 Ensure the bottom edge of base B10 the first P8 panel inserted into Step 4 two walls Repeat the step 2 for other Step 5 Ensure the bottom edge of the top edge of th...

Page 9: ...against the first P9 panel inserted into Side wall panels Installation P9 P9 P9 D2 B10 D2 P9 P9 x4 P9 P9 P9 P9 D2 D2 D2 D2 Ensure the bottom edge of base B10 Ensure the bottom edge of Insert the firs...

Page 10: ...gether in the middle with 2 pieces F6 screws 1 Put the 2 pieces panels P7 together Step 1 2 Make sure the two panels are against each other Edge frame D1 installation F6x6 Step 2 Fix D1 P7 with 6 piec...

Page 11: ...to figure I Stick the 4 pieces on the inside surfaces of the 2 Door sealer S10 Installation B3 x2 DOOR B3 B7 B3 B7 F5 DOOR DOOR S10 S10 S10 B3 B7 B3 F5 x2 Cut the S10 adhesive stripe in 4 pieces 33 l...

Page 12: ...5 B7 1 F5 B7 1 2 x2 2 2 1 1 Don t fully lock F5 screws Step I Place10 pieces F5 screws into the pre drilled holes on the upper not fully locked Step II and ensure the tail of F5 screws inserting into...

Page 13: ...1 1 13 x2 3 3 13 13 6 6 1 2 2 F4 F4 F4 F4 F4 Installation for the frame of greenhouse Don t lock F4 screws Step I but don t fully tighten them 1 profiles Step II into the frame profiles 3 Inserting t...

Page 14: ...greenhouse 5 x1 9 x2 F8 x2 F4 x13 7 x2 x2 9 F4 F4 F4 F4 5 x2 F4 F4 7 9 3 x2 3 9 F8 1 2 x2 14 x2 14 F4 F4 14 5 3 3 13 13 6 14 9 9 into 7 9 and 5 parts Fix the other end of part 9 on to part 1 with Rein...

Page 15: ...ch 13 and 6 part Step I 25 400 25 400 12 x2 B1 x2 F4 x7 1 13 P3 P6L P6R P3 x2 4 P6R P6L 12 12 4 P3 P3 3 3 13 13 6 13 13 6 P3 P3 13 13 1 4 P3 P3 6 13 13 F4 F4 F4 F4 F4 F4 x2 B1 F4 F4 12 P6L B1 F4 7 12...

Page 16: ...p IV in each of profile 13 in each of profile 12 Step III 8 B6 x2 F4 x9 x2 F4 x2 8 B13 F6 x3 8 B13 B6 B6 12 13 6 13 F4 x1 12 x2 13 F4 x1 8 F4 F4 12 12 F4 F4 F4 B13 F6 F6 F6 13 13 6 12 8 8 B13 8 B6 F4...

Page 17: ...0 P5 F4 x2 F4 x2 10 F3x2 S8L S8R 10 P5 8 12 12 B1 B1 S8L S8R P5 10 B1 F4 x2 x2 S8L S8R F3 F3 B1 10 P5 P5 12 Roof Panel Installation Pre place 2xF4 screws into the profile 10 connecting profile 10 Step...

Page 18: ...GB W5 W5 W4 W4 P4 P1 F3 F3 F3 F3 F3 F3 F3 F3 F8 F8 W5 W1 W1 P4 W5 F3 F3 Direction Direction W1 W4 F3 P1 W3 GB P1 F8 F8 S6 x2 S6 S6 S6 S6 F3 F3 W4 W4 W3 W3 P1 Direction Middle Window Bottom Window Han...

Page 19: ...11 12 10 W5 11 W4 W5 W1 W1 11 10 W1 W5 W5 W1 W1 W4 11 S8L x2 S3 8 F3 S3 P1 P4 12 3 12 13 11 11 Installation for rail 11 Insert rail profile 11 into the grooves of profile 10 Roof corner plastic caps...

Page 20: ...S7L S7R S9L S9R S5 x2 F2 x2 x2 S7L S5 S9L F2 F1 F1 W5 x4 11 11 W5 W4 S9L S7L S7R S9R S5 S5 Installation for plastic end caps Install S7R in same way Install S7L with 2 pieces F1 screws Install S9R in...

Page 21: ...21 Plastic corner caps S1 S1L and S1R installation S1 x2 S1L S1R F3x6 F3 F3 F3 S1 S1L x2 x2 S1 S1L S1R Lock all F4 F5 F6 F8 Screws Congratulation You did it...

Page 22: ...22 Display how to open and close the window and door...

Page 23: ...ots or dirt is shown 3 The boards panels have flame retardant polycarbonate material applied to them 2 Clean films regularly to keep the light transmittance as clear as possible and is recommended to...

Page 24: ...et functions essentially as new including tears rips chips scratches or stretching of materials and stitching 3 Tears rips punctures scratches or any damage caused by improper installation or use 4 Fa...

Reviews: