17
MEASUREMENT PROCEDURE
HI93716-
0
• Press
ZERO/CFM
and the lamp, cuvette and detector icons will appear on the display, depending
on the measurement phase.
• After a few seconds, the display will show
“-0.0-”
. The meter is now zeroed and ready for
measurement.
• Remove the cuvette.
• Add the content of one packet of
HI93716‑0
Bromine reagent. Replace the cap and shake
gently for about 20 seconds to dissolve most of the reagent.
• Replace the cuvette into the cuvette holder and ensure that the notch on the cap is positioned
securely into the groove