4
8X8 OPTIONAL SHELF
I N S T RU C T I O N S
1 - 23-7/8x92-5/8x5/8" Floor Panel
1 - 2x4x89-1/2" Floor Joist
2 - 2x4x48" Bond Boards
- 2" and 3" Nails
B
C
E
Parts needed to cut:
(1) - 89-1/2" Board cut down to 88"
88"
(2) - 48" Board cut down to 2
pieces of 24-11/16 and 23-3/16"
24-11/16"
24-11/16"
23-3/16"
23-3/16"
(1) - 23-7/8x92-5/8" Panel cut down to 23-7/8x89-1/2"
3" Nails
3" Nails
3" Nails
Center
of Stud
Center
of Stud
28"
32"
Rear Wall
3" Nails
3" Nails
3" Nails
24-11/16"
23-3/16"
E
B
B
E
C
C
Rear Wall
23-7/8x89-1/2" Panel
2" Nails
2" Nails
A
B
C
D
Cut
Cut
Cut
SHELF PARTS TO CUT:
A:
Cut the 89-1/2” Board
down to 88”. Cut both 48”
boards at 24-11/16”
leaving 23-3/16”. Finally
cut the 23-7/8x 92-5/8”
panel to 89-1/2”.
SHELF ASSEMBLY:
B:
Mark the 88” Board as shown at 28” then another
32”. Attach the 23-3/16” with (2) 3” nails as
shown. Attach the 24-11/16” boards to each end
of the 88” board with (2) 3” nails.
SHELF PANEL INSTALLATION:
D:
Center the 23-7/8x89-1/2” panel on the
shelf frame and attach with 2” nails as
shown.
C
E
B
SHELF INSTALLATION:
C:
Install the shelf frame resting on the horizonal Back
Wall Brace. Attach middle braces with 3” nails as
shown. Level front of frame and nail into Side
Wall Studs or Top Plate depending on your
building model with 3” nails as shown.
Summary of Contents for 16628
Page 7: ...7 NOTES...
Page 8: ...8 NOTES...