-11-
PRE-OPERATION
(Continued)
Slide pump on receiver and secure with pin (E) provided and install safety-locking device.
Slide spring loaded locking collar (F) on PTO yoke rearward, and slide yoke onto the tractor PTO shaft.
Release spring loaded collar. Be sure the pins fall into the grove of the tractor PTO shaft and collar
snaps forward into position. CAUTION: Do not use steel hammer to aid in joining PTO parts.
Remove weight from lift jack and place in storage position (G).
Connect four hydraulic hoses to the tractor (9’ pickups). Two hoses open and close the machine and the
other two supply oil to the electric/hydraulic solenoid valve for pickup heads.
Connect six hydraulic hoses to the tractor (12’ pickups). Two hoses open and close the machine, two
hoses raise and lower the left hand head and two hoses raise and lower the right hand head.
4.
5.
6.
7.
8.
F
E
G
Summary of Contents for TWIN MERGER
Page 6: ...4...
Page 9: ...7...
Page 11: ...9...
Page 21: ...DECAL LOCATION Continued 19 K H R S H I A L S B I J C I M P G C N F D E Q P O...
Page 24: ...22...
Page 26: ...FIGURE 2 24...
Page 28: ...FIGURE 3 26...
Page 30: ...FIGURE 4 28...
Page 32: ...FIGURE 5 30...
Page 34: ...FIGURE 6 32...
Page 36: ...FIGURE 7 34...
Page 38: ...FIGURE 8 36...
Page 40: ...FIGURE 9 38...
Page 42: ...FIGURE 10 40 PUMP SEE FIGURE 18...
Page 48: ...FIGURE 15 46...
Page 50: ...FIGURE 16 48...
Page 56: ...FIGURE 21 54...
Page 59: ...SERVICE MAINTENANCE RECORD DATE DESCRIPTION NOTES 57...
Page 60: ...SERVICE PARTS NOTES...
Page 62: ...H S MFG CO products approved for the FEMA SEAL OF QUALITY...