HAMWORTHY HEATING LTD
66
FLEET H series
500001212/F
Figure E2 - Typical Pipe Kit system connections
Boiler
1
Boiler
1
Boiler
1
Boiler
1
Boiler
2
Boiler
2
Boiler
2
Boiler
2
Boiler
3
Boiler
3
Boiler
3
Boiler
3
HHL optional frame and pipe kit with low loss
header for single secondary circuit
HHL optional frame and pipe kit with low loss
header fro three secondary circuits
Typical layout for primary circuit with low loss header
Typical layout for primary circuit with plate heat
exchanger separation of secondary circuits
AAV
AAV
AAV
AAV
Drain
Drain
Drain
Drain
Drain
Drain
Dosing Pot
Dosing Pot
Dosing Pot
Dosing Pot
Note:
- secondary circuit
components are not supplied
with the HHL pipe kit.
Note:
- secondary circuit
components are not supplied
with the HHL pipe kit.
Dirt/ Air Separator
Dirt/ Air Separator
Dirt/ Air Separator
Dirt/ Air Separator
Plate Heat
Exchanger
Flow
Flow
Flow
Flow
Flow
Flow
Return
Return
Return
Return
Return
Return
Summary of Contents for F100H
Page 2: ......
Page 44: ...HAMWORTHY HEATING LTD 38 FLEET H series 500001212 F Figure 8 3 11 Operating phases...
Page 75: ...HAMWORTHY HEATING LTD 69 FLEET H series 500001212 F NOTES...
Page 78: ......
Page 79: ......