background image

 

3 HAMPTONBAY.COM

 

 

Please contact 1-855-HD-HAMPTON for further assistance.

Pre-Installation

PLANNING INSTALLATION

Before beginning assembly of this product, make sure all parts are present. Compare parts with the Hardware Included and Package 
Contents lists. If any part is missing or damaged, do not attempt to assemble the product. Contact customer service for replacement parts.

IMPORTANT:

 Requires 2 people for the installation work. 

Approximate installation time: 10~15 minutes

TOOLS REQUIRED

Claw 
hammer

Phillips 
screwdriver

Electric 
drill

HARDWARE INCLUDED

NOTE:

 Hardware not shown to actual size. To avoid destroying 

the finish, do not put the parts on the ground directly.

AA

BB

CC

DD

EE

FF

Part

Description

Reference No . Quantity

AA

Self tapping screw

SP142

4

BB

Expansion sleeve

SP143

4

CC

Stake

SP178

4

DD

Spiral stake

SP139

4

EE

L-shape wrench

SP177

1

FF

Guide rope

SP181

4

Summary of Contents for NS PUG 144-300D

Page 1: ...online to see our full line of products available for your home improvement needs Thank you for choosing Hampton Bay USE AND CARE GUIDE STOCKTON 12 FT X 12 FT CANOPY WITH NETTING Questions problems m...

Page 2: ...as possible damage will occur to the structure WARNING Keep all flame and heat sources away from this gazebo fabric This Gazebo is made with fabric that meets CPAI 84 specifications for flame resistan...

Page 3: ...ustomer service for replacement parts IMPORTANT Requires 2 people for the installation work Approximate installation time 10 15 minutes TOOLS REQUIRED Claw hammer Phillips screwdriver Electric drill H...

Page 4: ...4 Pre Installation continued PACKAGE CONTENTS A B C D E Part Description Quantity A Canopy frame 1 B Small top 1 C Large top 1 D Mosquito netting 1 E Wheeled storage bag 1...

Page 5: ...ce Assembly 1 Opening the canopy frame With two people on the diagonal ends lift and partially pull the canopy frame A apart A 2 Attaching the small canopy Unfold the small top B and place it over the...

Page 6: ...ach the four canopy corners to the awning poles then tie the small top B and large top C together with the ropes 4x 4x 4x C A B 4 Locking the frame Under the canopy place one hand on the upper frame a...

Page 7: ...ight Press the red button on each leg and raise or lower to adjust the canopy height 4x 6 Hanging the mosquito netting Unfold and open one zipper of the mosquito netting D Connect the velcro loops aro...

Page 8: ...4x 4x 4x 4x 4x DD AA BB AA Measure out each leg to a proper distance Secure four self tapping screws AA to the wooden deck Concrete ground 4x 4x 4x 4x 4x DD AA BB AA Measure out each leg to a proper...

Page 9: ...F to the metal rings on the frame and tie the attached ropes to the stakes CC in the ground Ensure the ropes FF have the proper tension by adjusting the plastic adjusters on the ropes 4x 4x CC FF FF F...

Page 10: ...ference No Quantity 1 Central pole SP165 1 8 Leg extend SP171 4 2 Central bottom hub SP002 1 9 Bolt kit SP172 28 3 Top cap SP166 4 B Small top SP173 1 4 Slider SP167 4 C Large top SP174 1 5 Ceiling as...

Page 11: ...problems missing parts Before returning to the store call Hampton Bay Customer Service 8 a m 7 p m EST Monday Friday 9 a m 6 p m EST Saturday 1 855 HD HAMPTON HAMPTONBAY COM Retain this manual for fu...

Reviews: