HG2200/HG2200AT
Operator’s Manual
Set Up and Configure
Burst Pipe - 77
Set Up Mast
1. Remove mast from storage position.
2. Ensure cable has eye (shown).
3. If cable does not have eye, use a mast stop
(shown).
Moving parts can crush and cut hand or foot. Stay away.
To help avoid injury:
•
Keep hands and fingers clear of the mast.
•
Ensure no personnel are in the pit as equipment is lowered.
•
Keep winch doors closed during operation.
j64om019w.eps
j64om024w.eps
Summary of Contents for HG2200AT
Page 51: ...HG2200 HG2200AT Operator s Manual Battery Disconnect 50 Controls...
Page 75: ...HG2200 HG2200AT Operator s Manual Retrieve Tracked Unit 74 Transport...
Page 87: ...HG2200 HG2200AT Operator s Manual Finish Installation 86 Burst Pipe...
Page 129: ...HG2200 HG2200AT Operator s Manual As Needed 128 Service...
Page 133: ...HG2200 HG2200AT Operator s Manual Declaration of Conformity Information 132 Specifications...
Page 137: ...HG2200 HG2200AT Operator s Manual 136 Service Record Service Performed Date Hours...
Page 146: ......