Try to keep the measuring hose flat with 

the inner wall of the pipe. Use a small 
opening to insure you are measuring
static pressure and not velocity pressure

P (1, 2, 3) A

These will be negative pressures relative to atmosphere

P (1, 2, 3) F

These will be positive pressures relative to atmosphere

Example
P1A = -0.32” wc
P1F = 0.4” wc
Then the total pressure drop is:

∆P 

total = -(P1A) + P1F = -0.32 + 0.4 = 0.72” wc

Calculations are done with:

• All boilers at high fire

• Water temperature 160/180ºF (gives the hottest flue gasses)

• All readings must be taken with boiler front cover installed

Doing the measurements under these conditions will give the most accurate results. There may be minor differences between appliances.

Use of a static pressure 

tip for measurement is 

also recommended

 

• A pH test must be performed at the exit point of the condensate neutralizer with litmus paper to test for 

 

  acidity. pH level should be within 6.6-7.0. If the pH is less than 6.6, replace neutralizing medium.

 

• Checking the minimum and maximum settings on the display must be performed as a final check.

 

• All findings and concerns should be discussed with the appliance owner after the inspection is complete.

ANNUAL INSPECTION CONT.

Summary of Contents for EVO 299

Page 1: ...ld result in loss of warranty and or severe personal injury death and or substantial property damage 34000 Autry Street Livonia MI 48150 800 968 5530 Fax 734 419 0209 www hamiltonengineering com LIT91...

Page 2: ...the owner An inspection should cover at a minimum the following areas Download and review operating hour data and fault history Inspect all fittings controls and connections for leaks damage or fouli...

Page 3: ...e front of the heat exchanger to break If excess resistance is encountered when installing a M6 nut discard that nut and use one of the spares shipped with the unit The maximum torque for assembling a...

Page 4: ...te cleaning instructions on page 53 55 Check the distance from the electrode to the burner there should be a 3 8 gap in between the two If the existing electrode pins must be adjusted for proper gap c...

Page 5: ...PRESSURE P MODEL AIR PRESSURE P HW129 6 wc HW399 1 wc HW179 96 wc HW599 86 wc HW199 1 68 wc HWH 1499 1999 8 wc Hamilton EVO Products Flow and Pressure Drop GPM Feet of Head Design HW 79 129 8 HW 179 1...

Page 6: ...at high fire Water temperature 160 180 F gives the hottest flue gasses All readings must be taken with boiler front cover installed Doing the measurements under these conditions will give the most acc...

Page 7: ...e sure the bucket is under the open drain trap assembly to catch the debris and water 4 Rinse out the clean out cap in a sink to remove any dirt or buildup that may have accumulated 5 Condensate drain...

Page 8: ...t and should always be replaced during the annual maintenance procedure To limit risks the following instructions must be adhered to PROPER PROCEDURE Before installing a burner door the two gaskets an...