background image

97715C  (Rev. D - 02/18)

HRFGEBP_A, HRFGSBP_A

Page 1

To assure you install this model easily and correctly, PLEASE READ THESE SIMPLE 

INSTRUCTIONS BEFORE STARTING THE INSTALLATION. CHECK YOUR INSTALLATION 

FOR COMPLIANCE WITH PLUMBING, ELECTRICAL AND OTHER APPLICABLE CODES. 

After installation, leave these instructions inside the fountain for future reference.

Halsey Taylor Owners Manual

Non-Refrigerated Marblyte Fountain

 with Back Panel

Installer

IMPORTANT! INSTALLER PLEASE NOTE.

THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO 

WATER LINES IS A COMMON PROCEDURE. THIS GROUNDING MAY BE IN THE BUILDING OR MAY 

OCCUR AWAY FROM THE BUILDING. THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTO 

A FOUNTAIN, CREATING AN ELECTROLYSIS WHICH CAUSES A METALLIC TASTE OR AN INCREASE 

IN THE METAL CONTENT OF THE WATER. THIS CONDITION IS AVOIDABLE BY USING THE PROPER 

MATERIALS AS INDICATED. ANY DRAIN FITTINGS PROVIDED BY THE INSTALLER SHOULD BE MADE 

OF PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN FROM THE BUILDING PLUMBING SYSTEM.

IMPORTANT

ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON

TUBE IS 

SECURED

IN POSITION

SIMPLY PUSH IN

TUBE TO ATTACH

PUSH IN COLLET

TO RELEASE TUBE

PUSHING TUBE IN BEFORE

PULLING IT OUT HELPS TO

RELEASE TUBE

FIG. 2

OPERATION OF QUICK CONNECT FITTINGS

FIG. 1

NOTE: WATER FLOW

DIRECTION

BUILDING WATER INLET

SERVICE STOP

(NOT FURNISHED)

1/4" O.D. TUBE

WATER INLET

TO COOLER

3/8" O.D. UNPLATED COP-

PER TUBE CONNECT

COLD WATER SUPPLY

Reviews: