Halfen HIT-HP MV Assembly Instructions Manual Download Page 24

© 20

14

 HALFEN GmbH, German

y

applies also t

o

 cop

ying in e

xtracts.

NOTES REGARDING THIS DOCUMENT

Technical and design changes reserved.

 The information in this publication is based on state-of-the-art technology 

at the time of publication. We reserve the right to make technical and design changes at any time. Halfen GmbH 
shall not accept liability for the accuracy of the information in this publication or for any printing errors.

The Quality Management System of Halfen GmbH is certifi ed for the locations in Germany, France, the Netherlands, 
Austria, Poland, Switzerland and the Czech Republic acc. to 

DIN EN ISO 9001:2008

, Certifi cate No. QS-281 HH.

Furthermore HALFEN is represented with sales offi

  ces and distributors worldwide. 

Please contact us: www.halfen.com

Austria

HALFEN Gesellschaft m.b.H.
Leonard-Bernstein-Str. 10
1220 Wien

Phone: +43 - 1 - 259 6770 
E-Mail: offi

  [email protected]

Internet: www.halfen.at

Fax:  +43 - 1 - 259 - 6770 99

Belgium /
Luxembourg

HALFEN N.V.
Borkelstraat 131
2900 Schoten

Phone: +32 - 3 - 658 07 20
E-Mail: [email protected]
Internet: www.halfen.be

Fax:  +32 

- 3 - 658 15 33

China

HALFEN Construction Accessories Distribution Co.Ltd.
Room 601 Tower D, Vantone Centre
No.A6 Chao Yang Men Wai Street
Chaoyang District 
Beijing  ·  P.R. China 100020

Phone: +86 - 10 5907 3200
E-Mail: [email protected]
Internet: www.halfen.cn

Fax:   +86 - 10 5907 3218

Czech Republic

HALFEN s.r.o.
Business Center Šafránkova
Šafránkova 1238/1
155 00 Praha 5 

Phone: +420 - 311 - 690 060
E-Mail: [email protected]
Internet: www.halfen-deha.cz

Fax:  +420 - 235 - 314308

France

HALFEN S.A.S.
18, rue Goubet
75019 Paris

Phone: +33 - 1 - 445231 00
E-Mail: [email protected]
Internet:  www.halfen.fr

Fax:  

+33 - 1 - 445231 52

Germany

HALFEN Vertriebsgesellschaft mbH
Katzbergstrasse 3 
40764 Langenfeld

Phone: +49 - 2173 - 970 0
E-Mail: [email protected]
Internet: www.halfen.de

Fax:   +49 - 2173 - 970 225

Italy

HALFEN S.r.l. Soc. Unipersonale
Via F.lli Bronzetti  N° 28
24124 Bergamo

Phone: +39 - 035 - 0760711
E-Mail: [email protected]
Internet: www.halfen.it

Fax:  +39 

- 035 - 0760799

Netherlands

HALFEN b.v.
Oostermaat 3
7623 CS Borne

Phone: +31 - 74-2 67 14 49
E-Mail: [email protected]
Internet: www.halfen.nl

Fax:  +31 

- 74-2 67 26 59

Norway

HALFEN AS
Postboks 2080
4095 Stavanger

Phone: +47 - 51 82 34 00
E-Mail: [email protected]
Internet: www.halfen.no

Fax:  +47 

- 51 82 34 01

Poland

HALFEN Sp. z o.o.
Ul. Obornicka 287
60-691 Poznan

Phone: +48 - 61 - 622 14 14
E-Mail: [email protected]
Internet: www.halfen.pl

Fax:  +48 

- 61 - 622 14 15

Sweden

Halfen AB
Vädursgatan 5
412 50 Göteborg

Phone: +46 - 31 - 98 58 00
E-Mail: [email protected]
Internet: www.halfen.se

Fax:  

+46 - 31 - 98 58 01

Switzerland

HALFEN Swiss AG
Hertistrasse 25 
8304 Wallisellen

Phone: +41 - 44 - 849 78 78
E-Mail: [email protected]
Internet: www.halfen.ch

Fax:  

+41 - 44 - 849 78 79

United Kingdom /
Ireland

HALFEN Ltd.
A1/A2 Portland Close
Houghton Regis LU5 5AW

Phone: +44 - 1582 - 47 03 00
E-Mail: [email protected]
Internet: www.halfen.co.uk

Fax:  +44 - 1582 - 47 03 04

United States of 
America

HALFEN USA Inc.
8521 FM 1976
P.O. Box 547
Converse, TX 78109

Phone: +1  800.423.91 40
E-Mail: [email protected]
Internet: www.halfenusa.com

Fax:  +1 877 . 683.4910

For countries not 
listed 

HALFEN International

HALFEN International GmbH
Liebigstr. 14 
40764  Langenfeld / Germany

Phone: 

+49 - 2173 - 970 - 0 

E-Mail: [email protected]
Internet: www.halfen.com

Fax: +49 - 2173 - 970 - 849

CONTACT HALFEN WORLDWIDE

HALFEN is represented by subsidiaries in the following 14 countries, please contact us:

U - 909 - 0

7/1

5.000  0

7/1

4

Summary of Contents for HIT-HP MV

Page 1: ...07 14 Iso Element D Montageanleitung Assembly Instructions Notice d utilisation Montagehandleiding Instrukcja monta u Mont n n vod Izola n prvek CZ czniki balkonowe PL Koudebrugonderbreking NL Rupteu...

Page 2: ...tavbou mus b t ulo ena podle speci kace projektanta statika Zbrojenie p yty stropu i balkonu wykona wed ug projektu konstrukcji Patrz informacje strona 18 21 Meer informatie op pagina 18 21 Aansluiten...

Page 3: ...stallation Installation sur chantier Installatie op de bouwplaats Monta na budowie Mont na stavb D F PL GB NL CZ CZ Lagesicherung gew hrleisten Ensure that HIT will not be misplaced S curiser la posit...

Page 4: ...on eur Vlakke inbouw Po o enie wzgl dem muru Ulo te bez tepeln izolace D GB CZ A Jednovrstv zdivo B Zdivo se syst mem tepeln izolace C Dvouvrstv zdivo D Dvouvrstv zdivo se zadn m odv tr v n m Typy mon...

Page 5: ...3 35 3 3 35 3 35 5 35 35 35 3 3 35 3 3 3 3 35 5 HIT HP MV 1208 18 100 35 Positionstext Element 5 CuOr 5300S041785 Date 210613 Pos 20 Position position CuNo 12345678 Kundennummer customers number CuNa...

Page 6: ...ist beim Betonieren auf gleichm iges F llen und Verdichten zu achten Es wird empfohlen eine Lage sicherung der HIT Elemente vorzusehen 1 Einbau der bauseitigen Bewehrung 2 Einbau des HIT Elements von...

Page 7: ...estorte balkon Bekisting moet correct geplaatst worden 3 Vastbinden van de trekstaven van de TB box aan de bijleg wapening 4 Beton storten 2 Inbouw HIT element van bovenaf 1 Inbouw bijlegwapening conf...

Page 8: ...ementdecke 2 10 10 mm 80 120 HIT HPMV HIT SPMV ES 1 Einbau der Bewehrung der Elementdecke Variante a oder b 4 Lagerung 5 05 HIT HP MV 05 04 20 100 35 ES B cm H cm cv mm B 20 nCSB nTB cv 04 H 05 HIT HP...

Page 9: ...ransport Assurez vous que tous les l ments soient x s proprement pour le transport Aucune pr dalle ne peut reposer sur un l ment HIT 6 P eprava na m sto mont e Zajist te v echny prvky HIT b hem p epra...

Page 10: ...ekennzeich nete CSB Boxen und Zugstabboxen miteinander verbunden werden Bei der Montage der Zugstabbox auf der CSB Box ist die CSB Box unbe dingt von unten zu st tzen 3 4 Lagerung und Transport Beim T...

Page 11: ...trekstaven CSB boxen en TB boxen mogen alleen bij elkaar geplaatst worden als ze dezelfde markering hebben Zorg ervoor dat de CSB box over zijn volledige lengte ondersteund wordt tijdens montage Geen...

Page 12: ...HIT Zugst be 4 Einbringen des Betons und Betonr ttlung 1 Einbau des HIT Elementes 5a 5b 5 Lagerung und Transport Beim Transport ist auf eine sachgerechte Lagerung der Elemente zu achten Die Elementdec...

Page 13: ...ructeur 3 Vastbinden van de trekstaven a fout b juist HIT in prefab negatief gestort Mise en place Monta Ulo en prvku HIT F PL CZ 5 Stockage et transport A n d viter que les l ments HIT se d placent i...

Page 14: ...be 3 4 Einbringen des Betons 4 HIT HPMV HIT SPMV Einbau HIT Fertigbalkon 1 Einbau der bauseitigen Bewehrung 1 6 8 5 Lagerung und Transport Beim Transport ist auf eine sachgerechte Lagerung der Elemen...

Page 15: ...ntroleer of de rode pijl op het element naar het balkon wijst Mise en place Inbouw Monta Ulo en prvku HIT F NL PL CZ 1 Mise en place de l armature sur site 2 Mise en place de l l ment HIT dans balcons...

Page 16: ...ewehrung 9 Einbringen des Betons HIT HPMV HIT SPMV Einbau Fertigbalkon 7 Einbau der bauseitigen Bewehrung 6 Lagerung und Transport Beim Transport ist auf eine sachgerechte Lagerung der Elemente zu ach...

Page 17: ...de balcons pr fabriqu s balkon w prefabrykowanych prefabrikovan balkon Mise en place Monta Mont prvku HIT F PL CZ a chybn b spr vn a niew a ciwy b prawid owy 7 Mise en place de l armature sur site 7 U...

Page 18: ...gers abgeschr gt d a c b 3 Montagef lle a Montage als deckengleicher Unterzug b Montage mit Au ager HIT HPMV HIT SPMV Weitere Hinweise b a Lagerung 1 1 5cm 2cm Verformungen a Druck von unten auf Balko...

Page 19: ...Installatie met bekisting onder de vloer b Installatie met ondersteuning onder de vloer verhoging volgens opgave constructeur 4 Vervormingen a Druk onder de balkonplaat is te hoog b Aansluitwapening i...

Page 20: ...I 8 Entfernen der Abst tzungen Entfernen der Abst tzungen A1 Lockern und handfest xieren A1 Lockern und handfest xieren A2 Tr ger entfernen A2 Tr ger entfernen A3 Schalung entfernen und wenn erforder...

Page 21: ...ort type II 8 Renfort type III Dalsze uwagi Dal informace PL CZ 5 Usuwanie tymczasowego podparcia A1 Poluzowa i dokr ci r cznie A2 Usun podpory A3 Usun deskowanie i je li wymagane ponownie podeprze st...

Page 22: ...ES 5 TB TB HIT HP MV 05 04 20 100 35 ES CSB 4 CSB h3 11cm h2 2cm h2 3cm h2 4cm h2 9cm C h3 h2 h1 h1 H 20cm cv cv c B 100cm B 50cm B 25cm h1 30 5cm h1 35 5cm h1 50 7cm HALFEN Iso Element Einbau Kontrol...

Page 23: ...rola 6 Ulo en CZ 1 TB Box Skrzynka z pr tami rozci ganymi 2 D Box Skrzynka dystansowa 3 CSB Box Skrzynka z bloczkami CSB 4 HALFEN czniki balkonowe 5 identy kacja modu w cznika 6 monta modu w Element w...

Page 24: ...00 E Mail halfen halfen fr Internet www halfen fr Fax 33 1 44523152 Germany HALFEN Vertriebsgesellschaft mbH Katzbergstrasse 3 40764 Langenfeld Phone 49 2173 9700 E Mail info halfen de Internet www ha...

Reviews: