background image

4

B400 R (7190)

Hako system maintenance

Hako system maintenance

Hako system maintenance I (every 250 hours)
Battery and charger

• Check the battery and the charger

• Check the cables and plug connections of the battery and the charger for 

ease of movement, wear and corrosion

• Check the battery acid level and acid density, refill demineralised water 

if necessary

• Check the setting in the battery management system (BMS) and in the 

charger

Electrical system

• Check the electrical system (lighting, fuses and relays), replace parts 

if necessary

• Make sure the latest software version is installed, update software 

if necessary

• Read out the event log memory

• Check all the power connections to the controllers, drive control, power 

relays, fuses, power distributors

Steering and brake

• Check the steering for stiffness

• Check bearing clearance of the pinion and the universal joints
• Check the steering pinion and gear rim for damage, grease if necessary.

• Check proper functioning of the parking brake at the front and rear 

(only X-AC drive)

• Check the unlocking function of the parking brake at the front and rear 

(only X-AC drive); check indication on the multifunction display

• Check the brake for proper functioning

Braking deceleration when pressing the brake button must be noticeably 

stronger than when releasing the accelerator pedal

Wheels

• Front wheel: check the condition of tyres and the wheel mounting screws, 

re-tighten if necessary (170 ± 25 Nm)

• Rear wheels: check the condition of tyres and the wheel mounting screws, 

re-tighten if necessary. Standard drive: 50 Nm, X-AC drive:

 

72 Nm

Summary of Contents for Scrubmaster B400 R

Page 1: ...Scrubmaster B400 R RM RH 7190 Service booklet Part number 88 10 3256 Valid as from 03 2021...

Page 2: ...ised Hako workshop by reference to the machine specific system maintenance Hako system maintenance II every 500 hours Performance by an expert of an authorised Hako workshop by reference to the machin...

Page 3: ...ating hours Workshop stamp performed on at _______________ operating hours Hako system maintenance I 1750 operating hours Workshop stamp performed on at _______________ operating hours Hako system mai...

Page 4: ...controllers drive control power relays fuses power distributors Steering and brake Check the steering for stiffness Check bearing clearance of the pinion and the universal joints Check the steering p...

Page 5: ...flex wall for damage Check the fresh water level indicator calibrate if necessary Check leak tightness and proper functioning of the drain hoses fresh and waste water replace if necessary Check the c...

Page 6: ...necessary Check proper functioning of the coarse dirt flap lock only B400 RH High pressure cleaner One off oil change For oil see annex Engine Vehicle fluids Spray the following locations on the mach...

Page 7: ...he sweeping roller motors and check the carbon brushes for ease of movement and wear replace carbon brushes if necessary at the latest after 2000 operating hours Change the V belt in the pre sweep suc...

Page 8: ...Hako GmbH Head Office Hamburger Str 209 239 23843 Bad Oldesloe Germany Tel 49 4531 806 0 info hako com www hako com...

Reviews: