
33
Maintenance and Service
Hako-System Maintenance I
The following maintenance woks are to
be performed by an authorised Hako
Service workshop.
To be performed
Interval
every 125 hours of operation
Check tank lid sealing of the soiled water tank and replace if required
o
Check function of bailsystem and operating panel
o
Check drain hose of the soiled water tank and replace if required
o
Grease joints at the brush lift-out
o
Check wheel fixing screws and tighten (10 Nm) if required
o
Check condition of tyres
o
Grease joints at the squeegee holder
o
Test drive and function test
o