
13) Screw the 4 screws
in just a little at a time while gradually increasing the torque. Progress around the screws
gradually tightening evenly until both halves are fully connected and tight with the motor plate.
14
) Replace the black J-Tube over the diaphragm outlet. Use existing clip to secure tube to outlet.
Repeat these instructions for the second diaphragm starting at #6.
15
) After both diaphragms have been replaced, put the white sound absorber back over the motor. Tap it
clean if it is dusty. Do not wash.
16
) Replace the outer metal housing onto the base and tighten the 4 screws. Wash the square air filter with tap
water and shake dry. Reinstall into the top of metal housing and replace the filter cover. Congratulations,
you’ve done it!
18
Summary of Contents for Matala HK-25L
Page 1: ......
Page 4: ...aerations aeration 3 OPERATION AND MAINTENANCE ASSEMBLY AND OPERATIONAL INSTRUCTIONS...
Page 5: ...Construction HK 25L...
Page 6: ...Construction HK 25LP 5...
Page 7: ...6...
Page 8: ...Construction HK 40LP 7...
Page 9: ...Construction HK 100L HK 120L 8...
Page 10: ...Construction HK 150L 200L 250L 9...
Page 11: ...3 3 4 4 5 5 5 6 5 5 5 6 7 7 MAINTENANCE 10...
Page 15: ...14 HK 100L and HK 120L Trouble shooting...
Page 20: ...130507...