25
A3. Error Detection Process
1.
Check to see if
Fuse is normal
No light and sound
Abnormal
Check VD603~VD606,
C607, N601etc.
Check to see if the
collector voltage of
VD622 is 24V
The failure ofhorizontal
unit orN201
Check to see if ,
N605 5v,
is normal
Check the control
voltage of V203 or
CPU power pin
Check N605 ,ect
Normal
Normal
Normal
Abnormal
Check to see 110V
、
180V
etc. voltage is normal
Test to see all terminal
Resistance of load
Check switch
power unit
Check to see if
rectifying tube
is normal
Check the
Loader
Change
rectifying diode
Abnormal
Normal
Abnormal
Normal
Abnormal
Normal
Abnormal
Summary of Contents for HTR20-A
Page 31: ...30 ...