3
Strict
Execution
Notice
Strict
Execution
Don
'
t
break
electric
wire
or
other invisible equipment when cutting
something or drilling holes on ceiling.
When
the
oil
exceeds
2/3
or
near
tick
mark
in
the
oil
cup
,
clean
it
in
time
.
Don
'
t
eat
waste
oil
from
oil
cup
.
When range hood is using in well sealed building, it should have air inlet
or open door to ensure good ventilation.
The wall of installing range hood needs enough strength. For hollow walls,
the thickness of solid layer of hollow wall must be more than 30mm, but for
concrete walls, it can be drill holes directly. The range hood must be fixed on
the wall firmly.
Strict
Execution
Strict
Execution
Because the installation is difficult and hood is heavy, the installation shall
be executed by professional person based on manul.
Strict
Execution
DISPOSAL
:
Do
not
dispose
this
product
as
unsorted
municipal
waste.
Collection of such waste separately for special treatment is necessary.
This product must not be disposed together with the domestic waste. This
product has to be disposed at an authorized place for recycling of electrical
and electronic appliances.
By collecting and recycling waste, you help save natural resources, and make
sure the product is disposed in an environmental friendly and healthy way.
Strict
Execution
Accessible
parts
may
become
hot
when
used
with
cooking
appliances
.