background image

Mark

 of

Haier

Safe

Water Heaters

Contents

See to the physical product for the appearance,color or pattern.

Friendly Hints

If water supply cutoff occurs in your home, please disconnect the power. Before
connecting power again, please open mixing valve to the mostest pitch of the hot water,
watch the showerhead until water comes out (indicating tank is full) and close mixing 
valve. This can ensure a longer life of heating element.
If you live in high-rise apartment with water pressure beyond rated range (e.g. more 
than 0.7 MPa), it is suggested you purchase a pressure reducing valve, which can 
ensure reliable operation and normal service life of the water heater.

1.

2.

To ensure water heater life, a magnesium rod is used to resist corrosion. Like a battery,
magnesium rod is consumed and needs replacement. It is suggested you contact our 
after-service once in two years to purchase a replacement magnesium rod. This can 
ensure a much longer water heater life.

3.

Installation

2

Features

5

Safety precautions

3

2

Parameters

Installation

Electric circuit diagram

Before Usage

Dimensions

3

Setting environment

6-7

Operation

9

8

9

8

8-9

Packing list

Operation instructions

Attentions in operation

Attentions in installation

Cleaning and maintenance

FAQ

7

Friendly hints

10

  This mark is the designation for Pre-Safe Expert of Haier 
Water Heater Company, which indicates use of the company's
patented technology inside the product. It ensures you a safe 
bath while monitoring whether your house ground wire is live or 
not all the time. If this mark is lighted on, it indicates your house 
ground wire has come live (poor grounding and live). In this 
case, please immediately stop use and unplug from the power 
supply, and remember not to touch any electric appliance shell
in your house. At the same time, immediately contact after-
sales service and your property management company for 
professional repair until the mark goes off.
  Pre-Safe Expert will become the electric safeguard for your
family.

Note: Above hints only apply to electric water heaters.

Pre-safe expert

FAQ*After service

Summary of Contents for FCD-JTHC80A-III (E), FCD-JTHC100A-III (E)

Page 1: ...ehold Electric Water Heater User s Manual Please read this manual before usage Retain it for future reference Qingdao Economic and Technological Development District Haier Water Heater Co Ltd Little Sea ox Group ...

Page 2: ...er water heater life 3 Installation 2 Features 5 Safety precautions 3 2 Parameters Installation Electric circuit diagram Before Usage Dimensions 3 Setting environment 6 7 Operation 9 8 9 8 8 9 Packing list Operation instructions Attentions in operation Attentions in installation Cleaning and maintenance FAQ 7 Friendly hints 10 This mark is the designation for Pre Safe Expert of Haier Water Heater ...

Page 3: ...kitchen outlet water is not suitable to drink Suitable for use in homes enterprises and institutions and service trade like hair beauty saloons Horizontal installation elegant style and space saving Your water heater is an improved product of this series Please use it as instructed in this manual Internal Cleaning To ensure high working efficiency heating elements and tank liner of water heater sh...

Page 4: ...ve handle to drain the tank To avoid injury before next use it is suggested to first open hot water valve before switching on the water heater exhausting gas possibly retained in the pipeline In this case no smoke or fire is permitted near the open valve Carefully check and confirm all parts are in good condition Provided hot water quantity can meet use demand temperature setting shall be possibly...

Page 5: ...led at designated position with no random modification The safety valve pressure relief vent shall keep open to the air Do not block it Installation Attentions in Installation Safety Precautions Haier C Symbol Denotation Do not proceed Wrong operation may cause fatal injury or death Do follow the instructions Wrong operation may cause human injury or house property loss The product adopts Haier Sa...

Page 6: ...drain hose as shown in Fig 2 Use sealing compound to prevent water leakage To facilitate installation and removal it is suggested a G 1 2 movable nut is fitted at appropriate locations on inlet and outlet pipes respectively Find water supply location Connect inlet pipe outlet pipe and city water pipe respectively to the use point Note To avoid heat dissipation hot water pipe shall not be too long ...

Reviews: