SERVICE MANUAL
Model:
CHM5BPL3/CHM7BPL2
9
Issue
Rev.
Chapter 3 Installation, adjustments and maintenance
3-1. Unpacking
1. Remove all packaging material; this includes the foam base and all adhesive tape holding the
freezer accessories inside and outside.
2. Inspect and remove any remains of packing, tape or printed materials before powering on the
freezer.
3-2. Adjusting
1. The freezer is designed for freestanding installation only. It should not be recessed or built-in.
2. Place the freezer on a floor strong enough to support it fully loaded.
3. When moving freezer, never tilt it more than a 45-degree angle. This could damage the compressor
and the sealed system.
4. If freezer is tilted let it stand in an upright position for at least 24 hours prior to plugging. This is to
allow the refrigerant to settle.
5.Proper Air Circulation
To assure the freezer works at the maximum efficiency it was designed for, you should install it in a
location where there is proper air circulation, Plumbing and electrical connections.
The following are recommended clearances around the freezer:
Sides…………..2”(50mm)
Top. ……………2”(50mm)
Back…………..2”(50mm)
Do not over fill freezer for proper internal air circulation.
3-3.Electrical Requirement
Make sure there is a suitable power Outlet with proper grounding to power the freezer.
Avoid the use of cutting off the third grounding, this is a dangerous practice since it provides no
effective grounding for the freezer and may result in shock hazard.