FIGURE 1
OVERALL INSTALLATION DIAGRAM
Page 1: ...at PCA marked J4 3 Using a clean soldering iron and safety glasses carefully solder the supplied connector to the soldering holes as shown 4 Run a 2 conductor 22 gauge or better shielded cable from th...
Page 2: ...FIGURE 1 OVERALL INSTALLATION DIAGRAM...