HAGOR 2199 Installation Manual Download Page 8

HAGOR Products GmbH | Oberbecksener Straße 97 | D-32547 Bad Oeynhausen | Telefon: +49(0)57 31-7 55 07-0 | Mail: [email protected]

Safety instructions

Risk of falling! When installing the beamer on the lift it might fall down. To attach the beamer to 

the lift, you may need a platform or a ladder for each person. A platform is preferable to a ladder. 

Make sure that the platform and / or the ladder is secure.

Danger of falling of the beamer on bystanders during operation. Fix the beamer.

Make sure that the beamer including the plugged-in cable does not protrude beyond the permit-

ted installation space in order to avoid collisions between the projector and the lift or surroun-

ding components during operation.

Risk of shear due to surprising start of the lift while installing the beamer. If the ceiling mount 

starts up unexpectedly during the installation process, fingers could be sheared off. Before 

installing the beamer, disconnect the ceiling mount from the power supply and put the plug in 

sight so that you can supervise it immediately to prevent unauthorized insertion. Move the lift to 

the lower position before separating the energy connection.

Risk of electric shock! If the beamers power cable gets into the mechanics of the lift, this can 

damage the cable insulation and make parts of the lift conductive. It is therefore essential to  

route the cables in the energy supply chain.

Installation of the beamer within the lift (standing)

 

 

•  

Move the lift to the lowest position.

 

•  

Disconnect the power supply to the lift by pulling the power plug. Place the power  

 

 

plug in sight to prevent accidental insertion by an uninvolved person.

 

 

•  

Fix the beamer using the included mounting materials.

 

 

•  

Attach one end of the cable guide to the platform and the other end to the

 

 

ceiling. When installing, make sure that the cable guide does not protrude beyond  

 

 

the installation surface of the projector when it is retracted.

 

 

•  

Lay all the required cables in the cable guide, making sure that they are the  

 

 

 

correct length. The cables must not be pulled too tight or get caught. Note: The lift  

 

 

is provided with a cable duct that is suitable for a limited number of cables. We do  

 

 

not recommend cables with large diameters as these cannot be suitable for mobile  

 

 

installation due to their large bending radius.

 

 

•  

Now restore the power supply to the lift. Test the proper installation of the  

 

 

beamer by means of a test run before you release the ceiling bracket for use.

 

 

•  

Make sure that the trial run runs smoothly and that there is enough space for the   

 

 

beamer, substructure and lift.

Summary of Contents for 2199

Page 1: ...n Telefon 49 0 57 31 7 55 07 0 Mail hagor hagor de Installation guide Homefix I Item no 2199 DE Installationsanleitung ES Gu a de instalaci n GB Installation manual FR Guide d installation SE Installa...

Page 2: ...setzen Sie diese bei Bedarf durch geeignete Materialien Falls Sie Bez glich der Installation des Produkts unsicher sind oder noch Fra gen haben wenden Sie sich an uns oder anderes ausgebildetes Fachpe...

Page 3: ...ted occurring forces This is a minimum requirement Also make sure that you comply with local regulations 3 Before starting make sure that all necessary fastening materials and tools are at hand Only m...

Page 4: ...e 15 Nm rated speed 15 UPM load max 25 kg standards DIN EN 13561 DIN EN 13659 DIN EN 14202 Safety instructions Risk of electric shock Before you start wiring work make sure that the lines are voltage...

Page 5: ...ket wrenches Set of ring spanners Set of allen keys Adjustable wrench Bubble level Ladder scaffolding or liftung platform Drills and bits Screwdriver Helper installation with two people is recommended...

Page 6: ...r and the screen and the installation instructions from the beamer manufacturer Observe the operating instruc tions of all devices Disconnect the lift from the power supply before installing it on the...

Page 7: ...ea does not run beyond the device storage space If necessary lay them in the offset 2 kink areas It is also possible to move the upper fastening point of the cable routing direct ceiling fastening in...

Page 8: ...the beamers power cable gets into the mechanics of the lift this can damage the cable insulation and make parts of the lift conductive It is therefore essential to route the cables in the energy suppl...

Page 9: ...and make parts of the lift conductive It is therefore essential to route the cables in the energy supply chain Installation of the beamer under the lift hanging Move the lift to the lowest position Di...

Page 10: ...to the lower position before separating the energy connection Risk of electric shock If the beamers power cable gets into the mechanics of the lift this can damage the cable insulation and make parts...

Page 11: ...out resistance If necessary adjust until the panel fits exactly into the inserts Trial run after installation A trial run must be performed to check the position of the cover to the suspended ceiling...

Page 12: ...r joint mechanism is an incentive for children to play When playing with the lift children could grab the mechanism and shear their fingers The beamer lift must not be operated by children Keep the ra...

Page 13: ...supply If the beamer lift does not lower even though engine noise can be heard when it is actuated this could be due to a blockage in the mechanics When the blockage is released the lift with the ins...

Page 14: ...arrying out any cleaning work disconnect the ceiling bracket from the power supply by pulling the power plug and placing it in sight so that you can monitor it immediately to prevent unauthorized inse...

Page 15: ...plier manufacturer of the media control The receiver replaces the receiver of the handheld transmitter included in the scope of delivery In the Homefix article a tubular motor is used which is also us...

Page 16: ...there are no people next to or below it Only operate the lift when you are in sight When loosening a blockage do not reach into the mechanics of the lift Before loosening a blockage disconnect the li...

Page 17: ...nrichtlinie 2006 42 EG EMV Richtlinie 2004 108 EG Angewandte harmonisierte Normen deren Fundstellen im Amtsblatt der EU ver ffentlicht worden sind EN ISO 12100 03 2011 Sicherheit von Maschinen Allgeme...

Page 18: ...HAGOR Products GmbH Oberbecksener Stra e 97 D 32547 Bad Oeynhausen Telefon 49 0 57 31 7 55 07 0 Mail hagor hagor de...

Page 19: ...HAGOR Products GmbH Oberbecksener Stra e 97 D 32547 Bad Oeynhausen Telefon 49 0 57 31 7 55 07 0 Mail hagor hagor de...

Page 20: ...HAGOR Products GmbH Oberbecksener Stra e 97 D 32547 Bad Oeynhausen Telefon 49 0 57 31 7 55 07 0 Mail hagor hagor de...

Reviews: