Install product only after completion of interior decoration in case
paint and chemicals may harm product.
Clean pipes and install area to get rid of mud, sand or other debris
may block the pipe and harm product.
Operating pressure: 1
–
10 bar. Water temperature: 4
–
75oC.
After installation, check all joints and connections to make sure they
are firmly fixed. Then keep water flow and turn on/off repeatedly to
ensure there is no leakage.
Angle valves must be applied.
Products must be clean with clean water after using to prevent any
damages from chemicals such as shampoo, cleansers or detergents.
Please use only soft cloth or sponge without any rough or hard
surface to clean.
Keep manual and spare parts included for maintenance.
The installation diagram is only for reference,the product is subject to the real object.
I. INSTALLATION NOTICES:
II.Installation Diagram
1