Ring Wave (Axos8 Only) 

 

 

9.1.2

 

Ring Wave menu 

Test  requirements  must  be  achieved  by  the  user  according  to  the  IEC  61000-4-12  norm.  The 
safety  standards  as  written  in  Table  1-1  must  be  unconditionally  fulfilled,  when  operating  the 
AXOS

8

In the next step, the user selects either the pre-compliance or the standard operation mode. The 
Figure 9-2: Ring Wave Standard mode and Figure 9-3: Ring Wave pre-compliance mode reflects 
either of the appliance modes. As seen by pressing on each particular function parameter a purple 
bow comes up and the definition of the function gets displayed. 

 

Figure 9-2: Ring Wave Standard mode 

When pressing the “home” button the user gets transferred automatically to the start menu. 

In the Figure 9-3: Ring Wave pre-compliance mode is shown the pre-compliance mode. Indeed, 
every  parameter  can  be  changed  by  simply  pressing  on  the  black  arrows  next  to  the  value. 
Furthermore, it can be changed between direct and line output. All data entries can be done while 
the generator is operating. It can be selected between 12 Ohm and 30 Ohm couple impedance 
of generator to EUT. 

 

Figure 9-3: Ring Wave pre-compliance mode 

 

 

 

Summary of Contents for AXOS

Page 1: ...AXOS Expandable test systems User Manual 4700924 Version 2 2 ...

Page 2: ...II Revision History Version Date Author Remarks 2 2 09 02 2022 SG New layout safety chapter adapted Axos5 and Axos8 shared document 2 1 13 12 2021 SG New logos ...

Page 3: ...he equipment particularly where software has been upgraded in the field Although all efforts are made to ensure that there are no errors in the manuals HAEFELY accepts no responsibility for damage or loss that may result from errors within this manual We retain the right to modify the functionality specification or operation of the equipment without prior notice All rights reserved No section of t...

Page 4: ... 5 Cleaning and Maintenance 16 3 1 6 Health Notes 17 3 1 7 Device Particular safety notes 17 3 2 Training and Education 18 4 Technical Data 19 4 1 Device General Specifications 19 4 2 Test Technical specifications 19 4 2 1 Surge 19 4 2 2 Ring Wave Axos8 Only 20 4 2 3 Telecom Wave Axos8 Only 20 4 2 4 Burst 21 4 2 5 Voltage Dips Interrupts 22 4 2 6 Integrated single phase CDN 22 4 3 Standards 22 4 4...

Page 5: ...mation 35 7 2 Combination wave generator 35 7 2 1 Open Circuit Voltage OCV 36 7 2 2 Short Circuit Current SCC 36 7 2 3 SURGE MENU 37 7 2 4 Properties 39 7 2 5 Transition 39 7 2 6 Trigger 40 7 2 7 Synchronization AC 40 8 Magnetic Field 41 8 1 General Information 41 8 2 Magnetic field menu 41 8 2 1 Coil antenna 42 8 2 2 Transition 43 8 2 3 Properties 43 9 Ring Wave Axos8 Only 45 9 1 General Informat...

Page 6: ...eral information 57 11 2 Burst menu 57 11 2 1 Output Coupling Paths 59 11 2 2 Properties 59 11 2 3 Transition 60 11 2 4 Trigger 60 11 2 5 Synchronization 61 11 2 6 Burst mode 61 12 Voltage dips interrupts 62 12 1 General information 62 12 2 Interrupts 62 12 3 Dips 63 12 3 1 Transformer DIP 116 64 12 3 2 External transformer 65 12 3 3 Properties 66 12 3 4 Transition 66 12 3 5 Trigger 67 13 Sequence...

Page 7: ... 84 16 1 1 Guarantee period 84 16 1 2 Liability for defects in material design and workmanship 84 16 2 Maintenance 85 16 2 1 Cleaning the Instrument 85 16 3 Verification 85 16 3 1 Waveform OCV Surge 85 16 3 2 Waveform SCC Surge 86 16 3 3 Electrical fast transient Burst 86 16 3 4 Burst verification adapter 87 16 4 Calibration 88 16 5 Spare Parts 88 16 6 Repair RMA 88 16 7 Support 89 16 8 Addresses ...

Page 8: ...VIII Introduction 19 Conformity 93 20 Notes 94 ...

Page 9: ...nt upgrades by only entering optional key codes into the licence code manager of the unit After entering the key code s the additional test functionalities like Surge Combination Wave Ring Wave Telecom Wave EFT Burst or Voltage Dips and Interrupts become available immediately No direct intervention has to be done by the user at all 1 1 1 Basic Device Information The AXOS compact immunity test syst...

Page 10: ... Figure 2 1 there are generally two operating modes of the menu available Only in pre compliance is it possible to change parameters even though the equipment is under test In addition by pressing a function parameter a basic description gets open and describes the characteristic of it The values can be directly specified as for each criteria necessary The same is possible in standard operating mo...

Page 11: ...Telecom Wave The following items are supplied Qty Description 1 Telecom Wave Modul TS 8 10 70μs only with AXOS8 Telecom Wave Test System 1 Automatic dips single phase transf DIP 116 only with AXOS 8 Dip Interrupt test 1 Mains Cable 1 User Manual 1 Calibration certificate On receipt of the unit check that all items have been delivered In the event of missing or damaged parts please contact your loc...

Page 12: ...ata Control Line Coupler 2498030 DEC 5 Symmetrical Data Control Line Decoupler 2490141 DEC 6 Symmetrical Data Control Line Decoupler 2490151 DEC 7 Asymmetrical Data Control Line Decoupler 2490161 DIP 116 Automatic Dips Transformer 16 A 40 70 80 2490410 MSURGE A Magnetic Field Test IEC EN 61000 4 9 2490441 VTM 15000 Isolation Test 1 2 50 us up to 10 kV 2499960 VTM 15000 05 Isolation Test 1 2 50 us ...

Page 13: ...e Key Code for Surge extension AXOS 4700814 4700911 EFT Burst Key Code Key Code for EFT Burst extension AXOS 4700815 4700912 Ring Wave Key code Key Code for Ring Wave extension AXOS 4700913 Dips Key Code Key Code for Voltage Dips extension AXOS 4700816 4700914 On receipt of the unit check that all items have been delivered In the event of missing or damaged parts please contact your local sales re...

Page 14: ...ormed Wherever possible the corresponding standard IEC ANSI definitions are used The following abbreviations and definitions are used in this manual Abbreviation Meaning AC Alternate current DC Direct current HV High voltage Qty Quantity RMS Root mean square EUT Equipment Under Test CDN Coupling Decoupling Network LED Light Emitting Diode IEC International Electro technical Committee EN European N...

Page 15: ...any national or regional regulations must be fulfilled beyond HAEFELY recommendations This system produces hazardous voltages that can causes in shocks burns or death It is the responsibility of the personnel to ensure that the system is operated in a safe manner HAEFELY and its sales partners refuse to accept any responsibility for consequential or direct damage to persons and or goods due to non...

Page 16: ... manual ground rod has to be installed It should be placed nearby the entrance of the test area 3 1 4 Mains Connection Connection of the system to a supply voltage outside the specified operating range will result in damage to the system along with the risk of injury and fire 3 1 5 Cleaning and Maintenance For cleaning and maintenance work it has to be ensured that all parts are disconnected from ...

Page 17: ... connection of the AXOS must be connected to a good earth If trigger is pressed without connection to earth electrical shock may occur Remove all external connection cables before removing any covers Do not open any system modules they contains no user replaceable parts Never touch the Equipment Under Test EUT when the AXOS is operating Establish a safety barrier around the test setup Close the ci...

Page 18: ... present one of them bears responsibility for the system and the performed tests The second person is the role of the safety observer Non test related persons who are working in proximity to the area where testing is performed must be informed Consistent visual and verbal signals should be agreed and followed Operator The person who makes the test connections and operates the system He must be abl...

Page 19: ...for external CDN external transformer etc Synch Input BNC 10V 264V AC External Start Stop Input 5V TTL starts stops predefined test sequence Analog Output 0 10V for use with external Safety Circuit stops the test when unlocked 4 2 Test Technical specifications 4 2 1 Surge IEC EN 61000 4 5 Edition 3 Surge Combination Wave Name Value Output Voltage 0 2 7 0kV 10 Voltage Rise Time 1 2us 30 Voltage Dur...

Page 20: ...1000 4 12 Edition 3 ANSI IEEE C62 41 Ring Wave Name Value Max Voltage 0 2 7 0kV 10 Frequency 100 kHz Rise time OC 5 µs Rise time SC 1 µs Impedance 12 Ohm 30 Ohm Peak Voltage Monitor BNC output 1000 1 Display 3 Digits Repetition rate Up to 30 pulses min Polarity Positive negative alternate Floating output Max 460 V AC Phase sync accuracy 1 Damping rate 0 4 peak1 peak2 1 1 Peak Current Monitor BNC o...

Page 21: ...socket 4 2 4 Burst IEC EN 61000 4 4 Edition 3 EFT Burst Name Value Output Voltage 0 2 5 0kV 10 at coaxial output Polarity pos neg alternate Output Impedance 50 Ohms Rise Time 5ns 30 Impulse Duration 50ns 30 at 50 Ohm 50ns 15 100ns at 1000 Ohm Burst Mode normal continuous real random Spike Frequency 1Hz 1MHz Burst Duration 10us 1s Burst Period 1ms 10s Test Time 1s 1000 minutes Trigger automatic man...

Page 22: ...1000 minutes Infinite Phase Sync 0 359 16 40 50 60 Hz asynchronous Mode RMS Current Monitor BNC Output 10A V Display 4 Digits 4 2 6 Integrated single phase CDN AXOS provides an integrated single phase coupling decoupling network for Burst Surge tests and Ring Wave It is protected against over current by an integrated protection circuit Current limit can be selected between 1A to 16A in the PROPERT...

Page 23: ... Magnetic field AXOS8 MSURGE A external unit IEC EN 61000 4 11 AC Voltage Dip and Interrupt AXOS8 DIP 116 external unit IEC EN 61000 4 29 DC Voltage Dip und Interrupt AXOS8 IEC EN 61000 4 12 Ring Wave AXOS8 ANSI IEEE C 37 90 EFT Burst AXOS8 ANSI IEEE C62 41 Ring Wave AXOS8 ITU K 20 K 21 K 44 K 45 Telecom Wave 10 700 AXOS8 TW8 external unit For detailed test description of each particular norm plea...

Page 24: ...ng chapter Safety 5 1 2 Ground connection The Earth Stud on the back panel must always be connected to a solid earth before the EUT Supply Input is connected to power source Cross section of connection must be at least 2 5mm squared 5 1 3 EUT inputs The EUT Supply Input on the back is the connection to the integrated single phase CDN which can be used up to 16A 264V There are three banana plugs st...

Page 25: ...ered to the EUT All further equipment connected after the isolation transformer are not protected any more by the residual current circuit breaker 5 1 4 Connection to EUT The L N and PE banana sockets on the front panel are the outputs of the integrated single phase CDN For power line testing the EUT is connected here There are three banana plugs non stackable delivered with the standard accessori...

Page 26: ...mbling and Installation Guide In case of interrupt testing i e 0 Dips test level V dip must be connected to N neutral input using the purple coloured safety banana cable supplied with the standard accessories ...

Page 27: ...impulse Direct connection to oscilloscope Example 5000Vsurge impulse outputs 5V on the BNC socket 3 Surge impulse current monitor output 1000A V surge impulse current monitor Direct connection to oscilloscope Example 2500A surge current outputs 2 5V on the BNC socket 4 Urms monitor output 100 1 Monitoring the signal of the generator when creating voltage dips or voltage interrupts Direct connectio...

Page 28: ... and adjustment will be controlled and entered via the touch screen 6 2 Device back pannel Figure 6 2 Axos8 back pannel Pos Function Description 1 L EUT Supply Input direct connection of power supply via banana plug direct single phase connection of power supply to the EUT It can either be connected to a DC power supply or to AC power supply Awareness the power supply should NOT be secured by a gr...

Page 29: ...for AXOS8 Switching on off total power supply 6 2 1 Auxiliary inputs and outputs AUX Pos 7 function description 1 Red warning lamp Indicates when safety circuit closed 2 Green warning lamp Indicates when safety circuit opened 3 GND 0 V 4 GND 0 V 5 Safety interlock When safety barriers installed connection must be done between pin 5 and pin 4 to close the circle safety instruments however bridge be...

Page 30: ... output When Burst Surge or Voltage dips package in use signal becomes 0 after the applied package has finished the signal becomes 1 negation used for indication of signal on oscilloscope 16 GND 0 V 17 Spare Reserve Not in use 18 GND 0 V ...

Page 31: ...tic field Voltage dips interrupts ring wave and TW8 it gets only applied from an external start stop automatic Last Calibration Factory calibration from HAEFEY TEST AG in future term the next calibration becomes last calibration Next calibration Recommended calibration period from HAEFELY is 2 years however it always depends on the quality management system of every company and certainly the test ...

Page 32: ...cted and applied through the generator to the EUT The Figure 6 4 Save and load option of data reflects the different option of managing the data at the Surge generator for example These application works similar for any other impulse generator The basic operation is similar to normal office applications Data can be operated as followed load Save Save as Copy and Delete Those options occur on the s...

Page 33: ...igure 6 5 File selection Internal Standard Selection in setup menu will not be applied to generator when not external control of the program 6 3 2 Defined AXOS Commands Predefined commands are available for the AXOS Those commands will be given to the unit via LAN network No Remote software is necessary For example remote control programs can be written in C language To receive all commands contac...

Page 34: ...ets displayed at touch screen 4 Reporting data symbol when pushing Rep Data button this floppy icon comes up in the right upper corner of the window and the report of the test will be saved via USB port on a connected device Note only accessible when test has finished 5 Symbol when L and N on EUT Supply Input are exchanged therefore L and N must be changed back 6 4 Test Report Data Test report dat...

Page 35: ...ause in extern CDN the polarity becomes important It can be select either between the Hi and Com output or the coupling network Position 9 10 11 in Figure 5 1 Furthermore 3 phases CDN likely the FP SURGE100M2 or FP COMB 32 can be chosen 7 2 Combination wave generator In General waveforms are specified as open circuit voltage OCV and short circuit current SCC The Surge is applied directly from the ...

Page 36: ...and COM in the front view can be done with the help of the in capture 15 2 1 described PDP 8000 7 2 2 Short Circuit Current SCC Figure 7 2 Short circuit current SCC 1 Front time T1 1 25 x T 8 µs 20 Time to half value T2 20 µs 20 For verification of the output signal a current transformer must be connected between position 6 and position 7 as shown in Figure 5 1 EUT Supply Input must ...

Page 37: ...re compliance mode reflects either of the appliance modes As seen by pressing on each particular function parameter a pink bow comes up and the definition of the function gets displayed Figure 7 3 Surge Standard mode When pressing the home button the user gets transferred automatically to the start menu In the Figure 7 4 Surge pre compliance mode it is shown the use of the pre compliance mode Inde...

Page 38: ...lected the screen will return to the operation mode standard or pre compliance The user is able to see nominal values of the peak voltage reputation time and the synchronization period Additionally these values can be modified while the test is proceeding It happens by simply pressing each particular function The test stops when pushing the STOP button Figure 7 6 Surge Pre compliance mode charging...

Page 39: ...area within the peak current min and max value of the surge waveform can become If not successful it causes an action which can be Ignore Alarm Test Stop or test stop line off Action Ignore Alarm Test stop Test stop line off Due to EUT fails AXOS8 cause an action which can be Ignore Alarm Test Stop Test Stop Line off Turn Line off Voltage locked at L N PE when test has finished Sound Acoustic sign...

Page 40: ... touch screen in the main operating window In external trigger the signal for the trigger comes from an external source and gets connected via PIN 11 in the AUX input at the rear view of the AXOS8 7 2 7 Synchronization AC To synchronize the surge signal with the main supply source it is necessary to adjust in the menu Synchronization and then Line Sync Further adjustments of the angle can be done ...

Page 41: ...in capture 1 1 must be unconditionally fulfilled 8 2 Magnetic field menu Standard mode is presented In Figure 8 1 Magnetic field Pre compliance mode The parameter can be entered by pressing the numbers For instance to change the magnet field the parameter 120 A m must be selected and then a new parameter entered Figure 8 1 Magnetic field Pre compliance mode In addition the purple bow describes the...

Page 42: ...g the home button the starting screen as shown in Figure 2 1 gets displayed Figure 8 3 Magnetic field charging In following points Coil Antenna Trigger Transition and properties will be described When being in the Setup menu Figure 6 3 Setup Menu manual has been selected for rep data therefore a test report can be written on a USB device simply by pressing Rep Data However first connect device to ...

Page 43: ...strength The other parameters stay equal since an OCC will be applied to the coil antenna and is basically a Surge impulse Figure 8 5 Magnetic field transition When all parameters has been entered then simply confirming with ok and in the menu is showing transition on this indicates the settings will be applied to the coil antenna when pushing the start button Furthermore when test is proceeding t...

Page 44: ...e Alarm Test stop Test stop line off Due to EUT fails AXOS8 causes an action which can be Ignore Alarm Test Stop Test Stop Line off Line off Voltage locked at L N PE when test has finished Line on Voltage unlocked at L N PE when test has finished Sound on or off Acoustic signal when test ends ...

Page 45: ...Operating Instructions must be carefully read before first use of the Ring Wave generator The peak voltage gets up to 7 kV The HI and COM signals should be used from the beginning as scheduled because with extern CDN the polarity becomes important It can be select either between the Hi and COM output or the coupling network Position 9 10 11 in Figure 6 1 Axos Front view Furthermore 3 phase CDN lik...

Page 46: ...essing on each particular function parameter a purple bow comes up and the definition of the function gets displayed Figure 9 2 Ring Wave Standard mode When pressing the home button the user gets transferred automatically to the start menu In the Figure 9 3 Ring Wave pre compliance mode is shown the pre compliance mode Indeed every parameter can be changed by simply pressing on the black arrows ne...

Page 47: ... the user is able to see nominal values of the peak voltage reputation time and the synchronization period Additionally these values can be modified while the test is proceeding It happens by simply pressing each particular function The test stops when pushing the STOP button Figure 9 5 Ring Wave Pre compliance mode charging In the right corner of the graphic is the plug flashing in red when direc...

Page 48: ...current min and max value of the surge waveform can become If not successful it causes an action which can be Ignore Alarm Test Stop or test stop line off Action Ignore Alarm Test stop Test stop line off Due to EUT fails AXOS8 cause an action which can be Ignore Alarm Test Stop Test Stop Line off Turn Line off Voltage locked at L N PE when test has finished Sound Acoustic signal when test ends 9 1...

Page 49: ...nu Synchronization and then Line Sync Further adjustments of the angle can be done in a range from 0 to 359 However if no power supply is connected to the EUT input at the rear view it has to be entered Async otherwise it is impossible to get a Surge impulse of the generator In external synchronization the output with the position 8 Figure 5 2 in the rear view is in use As an external source could...

Page 50: ...ing Wave Axos8 Only according to ANSI standard is indicated in Figure 9 8 ANSI Output Coupling Paths Ring Wave Figure 9 8 ANSI Output Coupling Paths Ring Wave Figure 9 9 Figure 8 8 IEC Output Coupling Paths ...

Page 51: ...the front time and time to half value The basic standard body is the IEC 61000 4 5 similar to the Combination Wave generator There the impulse form is defined Further important standards are the ITU K 20 K 21 K 44 and K 45 The impulse gets applied only to communication line To be able to apply this impulse wave form to the EUT an external telecom wave TW 8 module is required 10 1 1 Open Circuit Vo...

Page 52: ...link cable intelligent input In the front view are three different coupling impedances 1 x 15 Ohm HI COM 4 x 40 Ohm 4 x 40 Ohm gas arresters options The user selects on the coupling unit TW8 module which impedance is required for the particular application In the block diagram Figure 9 8 the exact outputs are defined in accordance to the standard Figure 10 3 Telecom Wave module On the right hand s...

Page 53: ...DC input of the TW 8 module in the rear side of the unit No output at the front view of AXOS8 must be used for the 10 700 application Figure 10 4 Connection AXOS 8 TW 8 Module Figure 10 4 Connection AXOS 8 TW 8 Module In the next step the user selects either the pre compliance or the standard operation mode The Figure 9 5 and Figure 9 6 reflects either of the appliance modes By pressing on each pa...

Page 54: ...ery parameter can be changed by simply pressing on the black bows next to the value All data entries can be done while the generator is operating Figure 10 6 Telecom Wave pre compliance mode For instance in the standard mode after selecting the peak voltage field the Figure 10 7 Telecom Wave peak voltage opens up and the parameter can be entered In a similar way functions the repetition rate and t...

Page 55: ...nal outputs from decouple network of Telecom Wave module 10 1 6 Properties In the Figure 9 9 below is the properties menu displayed The Table 9 1 explains the function more detailed Figure 10 9 Surge properties The window gets closed when confirming the OK button Turn line off is turned off automatically because the impulse gets applied directly via TW8 module and there is no line output only dire...

Page 56: ...he alternative polarity makes possible to switch between positive and negative impulses Alternate polarity peak voltage can be selected and parameter entered Figure 10 10 Telecom Wave transition mode After successfully entering the parameter OK button can be pushed and then the Start button in the main menu Test should be proceeding now 10 1 8 Trigger In the trigger window it is possible to select...

Page 57: ...ing in the start menu the function Burst the user has the choice between standard and pre compliance mode It gets selected in the top icon bar The Figure 11 1 EFT BURST Standard mode shows the standard menu When pressing peak voltage repetition frequency burst duration a purple bow opens up and describes visually the waveform impulse Furthermore the user can select between properties trigger manua...

Page 58: ... In Addition it can be immediately selected between kV and V Figure 11 2 EFT BURST peak voltage configuration The following graphic represents the pre compliance mode In comparison with the standard menu every command gets displayed the entire visual description of the function is described through purple bows Main advantage of the pre compliance mode is that the parameter can be changed while the...

Page 59: ...t report can be saved on the USB device 11 2 1 Output Coupling Paths In Burst testing mode every line signal gets tested against GND PE In direct output the signals stands on the position 8 in Figure 6 1 Axos Front view It gets connected directly to the EUT or will be used for verification of the Burst waveform Furthermore it can be connected to three phase test CDN For further assistance please c...

Page 60: ...confirmed and setting gets applied to the Burst generator 11 2 3 Transition The Figure 11 6 BURST Transitionshows the transition menu It is possible to select independently peak voltage Repetition frequency Phase and Alternate polarity To be able to select Sync phase the synchronization has to be either set as line Sync or external Sync otherwise it is not possible to select explained in 10 2 5 Ev...

Page 61: ...nu Synchronization and then Line Sync Adjustments of the angle can be done in a range from 0 to 359 However if no power supply is connected to the EUT supply input at the rear view it has to be entered Async otherwise it is impossible to get a Burst waveform in the output In external synchronization the output with the position 8 Figure 6 2 Axos8 back pannel in the rear view is in use An external ...

Page 62: ...ssible to create without an external transformer To create those interrupts there must be a connection between V dip and N via the purple banana plug as seen in Figure 11 1 Additionally it has to be connected to an external powers supply source Afterwards it can be selected between pre compliance mode and standard operating menu The entering of duration interval test time synchronization via touch...

Page 63: ...nal can be selected V dip can either be 0 40 70 or 80 in reference to U1 nominal when using the D116 transformer The selection happens in the Dip Voltage menu field When selecting 0 it creates a voltage interrupt since the V dip becomes 0V The Figure 12 3 Voltage Dips Standard mode shows the voltage dips in standard mode When pushing the particular function name Dip Voltage Line sync duration inte...

Page 64: ...n external power supply has to be connected otherwise the synchronization with the phase would not be technical possible However by pushing the home button the starting menu 12 3 1 Transformer DIP 116 The HAEFELY AG DIP 116 transformer will be connected through the V Dip and the Link input at the rear view of the AXOS8 The DIP 116 has an independent connection to an external power supply via banan...

Page 65: ...th the AXOS8 compact immunity tester 12 3 2 External transformer The only connection from the external transformer Figure 12 6 External transformer with the compact immunity tester happens through V dip and N at the rear view via banana plug L and N from the external transformer gets connected to the power supply The output voltage between V dip and N gets displayed as adjusted at the transformer ...

Page 66: ...to the EUT Action Ignore Alarm Test stop Test stop line off Due to EUT fails AXOS8 cause an action which can be Ignore Alarm Test Stop Test Stop Line off Line off Voltage locked at L N PE when test has finished Sound on or off Acoustic signal when test ends 12 3 4 Transition The Figure 12 7 Voltage Dips Transition shows the transition menu It is possible to select independently Duration Interval P...

Page 67: ...ion name like for example interval 12 3 5 Trigger The trigger can be accessed either from pre compliance mode or standard mode when generator is not in use The user can select after pressing the trigger button between auto manual and external In Auto signal gets applied automatically in accordance to parameters In Manual pushing the start button after manual selection then pressing the trigger but...

Page 68: ...tart button The following points in this capture describe the operation menu more detailed and indicate few examples 13 2 Sequence menu To access the sequence menu the sequence button must be selected in the starting screen of the AXOS8 Figure 13 1 Sequence In the left corner of the Figure 13 1 Sequence you can select between adding a new impulse moving the step back and forward or simply deleting...

Page 69: ...lso Ring Wave Telecom Wave or any other impulse The next graphic displays the SURGE properties menu EUT causes the action stop when peak voltage 2kV In the Figure 13 3 Header in description menu of Sequence and Figure 12 4 description and comments can be saved for a sequence file as well as Report data flies Up to 16 pairs of description header content can be saved Figure 13 3 Header in descriptio...

Page 70: ...n the reporting tool of AXOS8 An example of the layout header and content is shown below reporting software Figure 13 5 Test Report 13 2 1 Add step in sequence With the following button a new step gets added into sequence This icon adds a new step in the sequence menu It can be either impulse test timer or comment ...

Page 71: ...ortant No new test can be created only existing file can be loaded from either the internal or standard directory On the other hand adjustment of files can be done in normal application mode of either generator Figure 13 6 Sequence file selection Figure 13 7 Sequence operation diagram Steps can be editted by clicking on the Specification area of any Step e g for Step 2 Steps can be selected withou...

Page 72: ...After selecting the start following three options get displayed When selecting all steps every command gets applied to EUT and after finished following windows gets shown in accordance to programmed function Finally when test sequence passed Figure 12 8 comes up It does not control the immunity criteria of the EUT Must be checked manually as described in capture 12 2 3 ...

Page 73: ...t is possibility to change the final result of the unit Passed or Failed EUT immunity pass fail criteria can be selected in Figure 12 9 as well Figure 13 9 Figure 12 9 Sequence result Criteria is saves when returining to sequence or after Axos is turned off 13 2 4 Clearing of result Sequence button for clearing the test results column ...

Page 74: ...dit a Test Step result will be cleared Figure 13 11 Sequence Test result of step cleared Results will be cleared if you edit a test step 13 3 Reporting of data Report data is saved automatically or manually by REPORT button according AXOS8 Setup Report Data Saving ...

Page 75: ... folder on AXOS8 internal storage and if insert on external USB stick This is same as for single Test Report Floppy symbol in header of Sequence dialog is blinking while report data saving to internal storage or external USB stick and also while saving ...

Page 76: ... license code for remote GUI Figure 14 1 the remote GUI section becomes enabled in Figure 5 3 When operating via WLAN only one remote device can control the AXOS8 because of safety measures However it can be controlled parallel via remote device and touch screen of AXOS8 14 1 1 Point to point remote control Connect Ethernet cable to RJ45 input at the rear view and to remote device e g laptop Figur...

Page 77: ...ging the adjustments from obtain an IP address automatically in use the following IP address Figure 14 3 Inter Protocol Version 4 TCP IPv4 Enter the new IP address as showed in the AXOS8 operation window e g Figure 14 2 Ethernet communication however the last digit must have 2 difference to initial IP address of AXOS8 Confirm with ok In the last step starting of installed free software VNC Viewer ...

Page 78: ...ion happens automatically the DHCP must be ticked as below Press renew and the IP Address will be given automatically to the AXOS8 Figure 14 5 Communication MAC Address In the next step the automatic given IP address can be written in the VNC Viewer Selecting of connect button and AXOS8 can be operated via remote device Significant AXOS8 uses the port 5900 and it must be given free in the particul...

Page 79: ...mple individual logo of calibration laboratory or individual company The input of data can be either supplied directly via the remote control software or when saving the data on a USB device Furthermore the data can be used from the sequence mode menu directly and the report gets created Detailed information will be provided with the reporting software tool ...

Page 80: ... found there please contact us You should have the following information ready when you call Model Number Serial Number Software version and options installed Measurement data and or print screen will be of tremendous help for locating and solving problems 15 2 Error Messages In the menu is a short summary of possible alarm messages which can occur when operating the AXOS8 15 2 1 Troubleshooting A...

Page 81: ...nominal of EUT max support with AXOS5 16A control EUT independently short circuit might occurred External CDN necessary if higher I nominal required EUT requires more than 16 A support current may EUT defect short circuit EUT protection of AXOS8 EUT requires more than 16 A support current may EUT defect short circuit EUT EUT requires more than 16 A support current may EUT defect short circuit EUT ...

Page 82: ...voltage with nominal frequency of 50 or 60 Hz L and N on EUT Supply Input are exchanged Exchange L and N on EUT Supply Input 15 2 2 Logic errors Alarm message Possible cause Action needed Too many spikes per second Decrease peak voltage rep frequency Burst or increase burst period Repetition frequency is too high Decrease peak voltage repetition frequency burst period burst duration incompatible D...

Page 83: ...t to Normal Trigger must be set to Auto Transition must be set off Incompatible settings Decrease peak voltage increase repetition rate Incompatible settings Decrease field strength increase repetition rate Incompatible settings Decrease dip duration or increase dip interval Entered value out of range Value must be in the range of min and max value Note Similar error can occur only with different ...

Page 84: ...er undertakes the erection upon completion thereof If dispatch or taking over or erection are delayed due to reasons beyond supplier s control the guarantee period shall end not later than 18 months after supplier s notification that the supplies are ready for dispatch For replaced or repaired parts the guarantee period starts anew and lasts 6 months after replacement or completion of the repair o...

Page 85: ...e cleaned from time to time with a soft moist cloth such as used by opticians 16 3 Verification In the next captures are descriptions of our additional verification equipment for the AXOS8 If further information required of any of the equipment please either contact your sales representatives or the HAEFELY AG technical support team directly 16 3 1 Waveform OCV Surge The HAEFELY PDP8000 is a diffe...

Page 86: ...the rear view when using the current transformer It can be directly purchased through the HAEFELY AG or contact your sales representative Figure 16 2 Current transformer 16 3 3 Electrical fast transient Burst The HAEFELY EFT Verification Kit includes a 50 Ω and 1000 Ω attenuator as required in the IEC 61000 4 4 standard The appropriate attenuator is fitted to the Burst coaxial output and an oscill...

Page 87: ...available for testing of every single phase L N PE front view from AXOS It gets connected with the PE pin Pos 12 Figure 5 1 and every single phase L N PE Figure 5 1 The BNC output of the burst adapter is then connected to the oscilloscope Do not connect EUT Supply Input to power supply when verification of burst output Figure 16 4 Burst verification adapter ...

Page 88: ...sically only original replacement parts can be used HAEFELY can obtain original or equivalent replacement parts For an efficient work the customer support needs the following system specific information Project number of the system Client s name System name plate information of the main components which contain the replaceable part Detailed description of the component that has to be replaced if p...

Page 89: ...ent problems or faulty operation should occur please contact the Customer Support Department of HAEFELY or your local agent The Customer Support Department can be reached at the following address found in chapter 16 8 We prefer contact via email Then the case is documented and traceable Also the time zone problems and occupied telephones do not occur Complete information describing the problem cle...

Page 90: ...es tettex com emc sales haefely com Service Phone 41 61 373 4444 Service E Mail emc support haefely com 16 8 2 China Office Haefely AG Representative Beijing Office 8 1 602 Fortune Street 67 Chaoyang Road Chaoyang District Beijing China 100025 Phone 86 10 8578 8099 Fax 86 10 8578 9908 Sales E Mail sales haefely com cn 16 8 3 Webpage Main Page https www haefely com Update Page https www haefely com...

Page 91: ...o longer available then packing of an equivalent standard or better should be used Whenever possible protect the equipment from mechanical damage during transport with padding Mark the container with the pictogram symbols Fragile and Protect from moisture 17 2 Storage If the instrument is to remain unused for any length of time it is recommended to unplug the mains lead In addition it is advisable...

Page 92: ... be disassembled and recycled No special instructions are necessary for dismantling The instrument is constructed of metal parts mostly aluminium and synthetic materials It might contain batteries see the product specification The various component parts can be separated and recycled or disposed of in accordance with the associated local rules and regulations ...

Page 93: ...Conformity 93 19 Conformity ...

Page 94: ...94 Notes 20 Notes ...

Page 95: ......

Page 96: ...HAEFELY AG Representative Office 8 1 602 Fortune Street 67 Chaoyang Road Beijing 100025 China 86 10 8578 8099 sales haefely com cn This document has been drawn up with the utmost care We cannot however guarantee that it is entirely complete correct or up to date Copyright HAEFELY Subject to change without notice ...