background image

 

 

 

 

18 

 

 

5.52.159.00.01.04 

 

12.2 

Pulleys 

 

12.3 

Load hook 

  Check bearings and pulleys yearly 

  Clean and lubricate the bearings of hooks and pulleys with grease 

  Slight bearings are maintenance free 

  When bearings resp. slight bearings are worn of, change the complete pulley 

 

12.4 

Gear 

Regular  checks  of  lubrication  are  necessary.  The  teeth  must  be  cleaned  and  re-lubricated  after  approx.  3 
years.  We  recommend  to  use  a  lubricant  of  class  EP2  or  similar  products.  In  case  of  severe  conditions  of 
use (e.g. dust, regular lifting of the nominal load,etc.), please shorten maintenance intervals. 

 

 

 

 

12.5 

Gear spring pressure brake 

During  the  check,  brake  lining  wear  is  verified.  The  brake  linings  must  be  replaced  when  the  wear  limit  is 
already reached at one position of the lining, - as this can be the case when wear of the linings is irregular. 

   

CAUTION!

 

The brake linings must be free from fracture. Avoid oil, grease, dirt and humidity on the brake linings as this 
increases wear. 

 

The brake lining for the ratchet lever hoist is tested for the whole product lifetime - under the precondition of 
appropriate use - and must only be replaced in case of extraordinary wear. 

NOTICE!

 

According to EN 13157 lifetime is 1500 operating cycles (lifting/lowering movements) with 300  mm lift with 
nominal load and normal operation conditions. 

 

Use by heavy conditions can shorten the product lifetime. In these cases, the thickness of the brake lining 
must be checked  more than  1x yearly.  The ratchet wheel with  the  brake  lining must be replaced when  the 
wear limit is reached or wear of the lining (one one side) is clearly visible. 

 

12.6 

Overload protection 

   

DANGER!

 

The factory setting of the overload protection/slipping clutch is secured by sealing. In case of any changes 
will void the warranty. Should maintenance be necessary, please contact a service company authorized by 
the manufacturer. 

 

 

12.7 

Lubricant - Selection 

FUCHS 

SHELL 

ESSO 

MOBIL 

TOTAL 

CASTROL 

KLÜBER 

Renolit FEP 2 

Alvania EP 2 

Unirex EP 2 

Mobilux EP 2 

MULTIS EP2 

-- 

-- 

Stabylan 5006 

-- 

-- 

-- 

-- 

Optimol Viscoleb 1500 

Klüberoil 4UH 1-1500 

-- 

-- 

-- 

-- 

-- 

-- 

Wolfracoat 99113 

Chain lubricant OKS 451 

Use 

 

Recommendation 

 

Interval 

Pulleys 

 

FUCHS 

RENOLIN PG220 

Acc. to demand 

12  month 

Use 

 

Recommendation 

 

Interval 

Load hook  

bearing 

 

FUCHS 

RENOLIN PG220 

Acc. to demand 

12  month 

Summary of Contents for 59/18

Page 1: ...5 52 159 00 01 04 Rev 04 HADEF Safety Lever Hoist Type 59 18 with multiple safety concept Installation Operating and Maintenance Instructions ...

Page 2: ...to changes Table of Contents 1 Information 3 2 Safety 4 2 1 Warning notice and symbols 4 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 5 2 4 Appropriate use 5 2 5 Basic safety measures 6 3 Transport and Storage 7 3 1 Transport 7 3 2 Safety device for transport 7 3 3 Storage 7 4 Description 7 4 1 Areas of application 7 4 2 Design 8 4 3 Functions 8 4 4 Important compon...

Page 3: ... persons trained by them subsequently Repairs Inspection and Maintenance work on the device must be carried out by HADEF or the qualified persons only 1 Information The products meet European Union requirements in particular the valided EU Machine Directive The entire company works acc to a certified quality assurance system as per ISO 9001 The production of components at our work is subject to st...

Page 4: ...ing devices as well as main energy supply lines must be assembled according to the valid rules and regulations For explosion proof equipment all these parts must be approved for use in area prone to explosion or they must be suitable for use in area prone to explosion The owner is responsible for this However in everyday operation this degree of safety can only be achieved if all measures required...

Page 5: ...censed qualified person Defective devices and load suspension devices must not be used until they have been repaired Only original spare parts must be used Non compliance will result in any warranty claims becoming void Liability and warranty will become void if unauthorized modifications of the units are made by the user The permissible ambient temperature when operating the devices Type of drive...

Page 6: ...ineer If the equipment has not been used for a period of time carry out visual checks of all main components such as chains load hooks etc and replace any damaged parts with new original spare parts before putting the equipment back into operation Do not use a hoist that is defective pay attention to any abnormal noise it makes during operation Stop working immediately in case of disturbances and ...

Page 7: ...one by qualified personnel No liability for any damage resulting from improper transport or improper storage 3 1 Transport The devices are checked and if so adequately packed before delivery Do not throw or drop the equipment Use adequate means of transport Transport and means of transport must be suitable for the local conditions 3 2 Safety device for transport NOTICE Should a safety device for t...

Page 8: ...quipment 4 4 Important components Gear Gear components are made of high quality material Load pressure brake Holds the load in any position A new brake system is used for the hoists Brake discs have sintered brake linings which when used appropriately makes them wear free for lifetime of the hoists According to DIN 13157 lifetime is 1500 operating cycles lifting lowering movements with 300 mm lift...

Page 9: ... mechanism Locks the hoist completely in case of failure of Brake and or Ratchet pawls and or Release mechanism Illustration 5 DANGER When the locking mechanism is activated the hoist must no longer be operated It must be overhauled by a qualified person Chain guide device to feed in the chain The chain is feeded into the hoist correcty even for overhead work Twisted chains are aligned before they...

Page 10: ... position cannot be changed either by the load nor by other influences 6 1 Tools 7 Control Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their operation They must be authorized by the employer for the operation of the equipment The employer must ensure that the operating instructions are available near the equipment and that they are acces...

Page 11: ...heel turns back to position OFF Free wheeling mechanism is switched OFF C Switch OFF the free wheeling D free wheeling OFF Illustration 12 NOTICE When free wheeling is activated and chain is pulled through the divice an increasind resistance must be there with increased speed This is no mistake 7 2 Brake and pawl The brake system needs a minimum load of 3 of the capacity Only this minimum load mak...

Page 12: ...more than one motor driven hoist movement i e lifting and trolley movement must be tested by a licensed qualified person before putting in operation An exception is hoists ready for operation acc validated national regulations with EU declaration of conformity Definition qualified person former expert A qualified person has learned due to occupational training and experience and the job that the p...

Page 13: ...ervals must be shortened correspondingly 10 3 Replacing the load chain CAUTION If there is any visible damage and when the conditions for replacement are reached i e one or several dimensions in the table have been reached there is corrosion or elongation the chain must be replaced When replacing the chain also check the chain wheels Procedure Only insert new chains in an unloaded state and as the...

Page 14: ...ction for deformations cracks and corrosion must be carried out CAUTION When the wear limit is reached the part must be exchanged by a new original part at commissioning daily checks 1st maintenance after 3 months Inspection Maintenance every 3 months Inspection Mainte nance every 12 months Check screw connections X X Check lifting lowering functions X X Check brake function X X for ratchet lever ...

Page 15: ...5 7 6 4 Table 2 Dimensions mm Chain size 7 1x21 7 9x23 8x24 9x24 8 9x27 10x28 1 10x30 13x36 16x45 L11 238 5 260 6 272 1 281 2 300 8 318 6 340 7 408 3 505 6 L1 22 3 24 1 25 3 26 1 28 1 29 6 31 8 37 9 47 4 dm 6 4 7 1 7 2 8 1 8 2 9 0 9 0 11 9 14 4 WARNING When the dimensions listed in the table are reached due to wear or deformation the chain must be replaced 11 3 Checking the load hook Load hook X m...

Page 16: ...t dn dvmin dn dvmin kg mm mm mm mm 800 12 11 1 7 5 6 9 1600 12 11 4 10 2 9 7 2500 14 13 3 11 5 11 3200 16 15 2 13 12 4 6300 16 15 2 13 12 4 9000 16 15 2 13 12 4 11 7 Check of Release mechanism When free wheeling is activated and chain is pulled through the divice an increasind resistance must be there with increased speed If the resistance decreases permanently and noticeably the brake linings mus...

Page 17: ... outside as this will not ensure the formation of a lubricating film within the links The adjacent link points must always be lubricated to prevent excessive wear If the same lifting operations are carried out constantly the switching area from a lifting to a lowering movement must be given special attention Thoroughly effected lubrication of the chain will prolong the life of the chain by approx ...

Page 18: ... product lifetime under the precondition of appropriate use and must only be replaced in case of extraordinary wear NOTICE According to EN 13157 lifetime is 1500 operating cycles lifting lowering movements with 300 mm lift with nominal load and normal operation conditions Use by heavy conditions can shorten the product lifetime In these cases the thickness of the brake lining must be checked more ...

Page 19: ...eplace defective parts by original spare parts It is difficult to lift the load Overload Reduce the load to nominal load Dirty chains gear or chain wheels Do maintenance lubricate chains gear and chain wheels Defect of chain gear or chain wheels Do maintenance and replace defective parts by original spare parts Load is lifted with interruptions Pawl spring is missing or defective Do maintenance an...

Page 20: ...tions Disassembly is carried out in reverse order to the assembly Please make sure that all operating material is disposed of in accordance with environmental regulations 15 1 Temporary decommissioning Measures are as above Also read the chapter Transport and storage 15 2 Final decommissioning disposal Measures are as above After disassembly ensure that the disposal of the equipment and any materi...

Reviews: