5.52.181.01.01.07
19
8
Operation
The following, important points must be observed when operating the equipment:
Read the safety instructions.
Never load the devices beyond their working load limit.
The prescribed maintenance intervals must be adhered to.
The lifting tackle or the load must be securely attached to the hook and be seated at the bottom of the
hook. The safety catch must always be closed.
DANGER!
It is not allowed:
pulling loose of stuck loads, dragging of loads and inclined pulling is not allowed.
in explosive atmosphere, except the unit is especially modified for it and marked by an indication label
In reactor containment vessels.
to transport people
The device is not suitable for use on stages and in studios
persons must not stand under a suspended load
9
Commissioning
9.1
General
Should the unit be used in Germany:
Please observe the validated, national accident prevention regulations.
For other countries:
Inspections as above. Please observe the national rules and regulations and the instructions in this manual!
NOTICE!
Hoists up to 1000 kg capacity and without motor-
driven trolleys of hoisting unit must be tested by a “qualified
person” before putting into operation for the first time.
Hoists of 1000 kg capacity and up or with more than one motor-driven hoist movement; i.e. lifting and trolley
movement, must be tested by a “licensed qualified person” before putting in operation.
An exception is “hoists ready for operation” acc. validated national regulations with EU-declaration of
conformity.
Definition “qualified person” (former expert)
A “qualified person” has learned, due to occupational training and experience and the job that the person has
done, the skills needed to tests the material for one’s work.
Definition “licensed qualified person” (former approved expert)
A “licensed qualified person” has, due through special occupational training, knowledge about testing of the
material for one’s work and knows the national accident prevention regulations and other prescriptions and
technical regulations. This person must test t
he material for one’s work regularly with regard to design and
kind of use. The license will be given to qualified person be the approved supervision authorities (ZÜS).
9.2
Compressed air connection
Before commencing work on the equipment, the main air supply line must be closed and secured against
inadvertent opening!
9.2.1
Main connection
The connections must be made according to the pneumatic connection diagram.
Connect to the existent hose nozzle.
The hose must be secured with a hose clamp.